RFI - Ecological Assessment Report

of 435

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (67.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 117, section 1. The text section number identifies this passage in the reader.

Erot..ion and Sediment Contra!
87.   Any person acting on this permit shall prevent eros!on and sediment export from leaving the
      site. Slte control measures such as silt fencing, controlled gravel access to the site and
      controlled dlsposal of waste, will be necessary.
      Plans detailing the rnethods of controlling erosion and sediment are required k) be submitted
      to the Council for approval prlor to obtaining a Development Permit for Operational Works.
Contributh::ms Towards Council !nfrallltru-ctur~
88.   The applicant must pay ccmtrlbutions towards trunk infrastructure in accordance with the
      following Planning Scheme Policies and Council Policies:
      a.    Planning Scheme Policy 12 - Public Open Space Contributions;
      b.    Planning Scheme Policy 13 - Contributions in Lieu of Off Street Parking;
      c.    Piarming Scheme Po!icy 16 -· Sewerage Headworks Contributions;
      d.    Planning Scheme Policy '!7 - Water Supply Headworks Contr;buUons;
      e.    Planning Scheme Poilcy 20 -· Pathway Trunk Network Contributions;
      f.    Cmmci! Policy - Rural Roadworks Contributions; &
      g.    Cour:cil Policy - Master Drainage Contributions.
      For material change of use of premises approvals the contribuUors must be paid prior h:1 the
      commencement of use, for reconfiguring a lot approval contrlbutions must be paid prior to
                       or
      Council approval the plan of subdivision.
      The actual amount of the contribution must be calculated and paid in accordance with the
      Planning Scheme Policies and variations due to indexation current at the time of payment
General
89.   Any Building Fermat Plans (or similar) submitted for Council approval must be accompanied
      by the relevant Community Management Statement (or similar) demonstrating compliance with
      the conditions of this approval.
90.   A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
      specifications for all engineering works that will become Council infrastructure, which shall be
      submitted in conjunction with an application foi a Development Permit for Operational Works.
      In this regard a DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be
      submitted in conjunction with any application for Operational Works.
91.   Digital detailed designs including drawings, calculations, specifications and a schedule ot
      works, :shall be submitted with any application for a Development Permit for Operational Works
      in respect of roadworks and stormwater drainage works. The design shall be in accordance
      with Council's Planning Scheme Policy PSP05 - Engineering Design Standards - Roads,
      Drainage and Earthworks. To avoid conflict with underground pipes or services, all existing
      and proposed services required by the development shall be shown on the plans.
92.   To facilitate production of As Constructed drawings it is suggested that a!l design drawings are
      submitted In the Asset Design and As Constructed (ADAC) digital format (Guidelines on the
      use of ADAC are available at ~ a u ) .
93.   A construction management plan/strategy to ensure no damage occurs to CouncU services
      shall be prepared by a suitably qualified Registered Professional Engineer and submitted to
      Council In conjunction with any application for Operational Works.
94.   Any damage caused to any public utility duiing the course of construction shall be repaired ti:>
      Council's standards and at no cost to Council.


                                                                                           Pege 10 of13
Log in to download the original file

RFI - Ecological Assessment Report.pdf · 67.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.