Skip to the record
Every meeting, every word.

Original source · versioned page text

RFI - Ecological Assessment Report

of 435

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (67.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 116, section 1. The text section number identifies this passage in the reader.

                                                 Limiting the routes for the heavy vehicles to the major road network and prohibit trie use
                                                 of the loc:a! roads as access to the site,
                                       ...I.I.   indicate provision for on-site and off-slte parking for the required workforce .
                                                 !ndlcate the 1ooat!on of loading and unloading areas.
                                                 indicate the location of any uholding'' areas for heavy vehicles, and
                                       e.        Or,:erating hours.
                                       f.        Maintaining dear pedestrian access around the site at all times.
                        78.            Construction staff shall not park on Serenity Close Oi elsewhere on-street Parking shall either
                                       be cm site, &n adjacent vaec.-;nt site or at a suitable off-site location serviced via a shuttle bus
                        79.            A detaUed t~ondiUon Survey must be carried out on existing struchJres, services! adjacent
                                       buildings and roads prior to any excavation or construction works taking piace en site. If
                                       distress a!ready exists, a photographic survey should be unde11aken, the distress rneasured
                                       and a plan to monitor changes to distress shalt be implemented. Remediation of any damages
                                       caused by construction of this development shall be unde,taken within 3 months of the
                                       completion of suostantia! works for this development.
                        80.            Any sig11lficant dust and dirt accumulating on adjoining buildings as a result of this
                                       development shall be removed at the end of substantial works it requested by the affactad
                                       bodies corporate.
                        Earthworks
                        8•i,           Filling works requked on site shall be carried out in accordance with Council's Planning
                                       Scheme Policy PSP5 -·· Engineering Design Standards, so as not to cause the additional
                                       ponding of water on any adjoining lands or the blockage of, or interference witti, any natural
                                       watercourses,
                        82.            Earthworks carried out on site shall not affect the structural integrity of any of the existing
                                       fences and/or structures and/or lands that border the development site. Fences that are
                                       affected shall be replaced prior to the Building Certifier issuing the Certificate of Classification,
                                       In this regard any fences to be replaced shall be clearly shown on the plans submitted for
                                       Operationai Works approval.
                        83.            Plans and details outlining the extent of earthworks required on site and any trees to be
                                       rataineri shall be submitted to Council for approval prior to obtaining :a Development Permit for
                                       Operationai Works.
                        84.            AH major excavations (including the basements and driveways) shall be shored to prevent
                                       batters extending into areas and vegetation to be retained. All tress to be retained shall be
                                       adequately tagged to Council's satisfaction and enclosed with a barrier fence to the drip line to
                                       prevent damage.
                        Acid Sulfate Soil~
                        85.            As the site Is located below the 20m AHO and above the 5m AHO, any excavation works
                                       consisting of 1OOm3 or greater which extends below 5m AHD must be carried out in
                                       accordance with State Planning Policy 2/02 Planning and Managing Deveiopment Involving
                                       Acid Suifate Solis. In this regard appropriate testing and supporting documentation prepared
                                       by a suitably qualified specialist shall be submitted to Council for approval prior to obtaining a
                                       Development Permit for Operational Works.
                        Site Stability
                        86.             A Geotechnlca! Engineer or similar qualified expert shail assess the soil condition on site,
                                        determine the soil classification, establish whether any measures are required to protect the
                                        stability of adjoining buildings and/or structures and/or land, and make recommendations on
                                        the type of foundation system(s) best suited for the proposed development.               The
                                        recommendations of this report shall be incorporated into the design and construction of the


41   I
     \
                ;£1~{\:.~posed development.
                                   I
                                  l.
                                                                                                                                 Pag.eo/1,




         .\                     I'
~\            ·s.....     ,,,..~/r.B.,~',;-
\:-,. ,/,';,j ----···-·, ;'. "/4
 '-:,s/~9~f_:(,;,
Log in to download the original file

RFI - Ecological Assessment Report.pdf · 67.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.