RFI - Ecological Assessment Report

of 435

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (67.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 142, section 1. The text section number identifies this passage in the reader.

 

3.0 SITE FAUNA MANAGEMENT

3.1 INTRODUCTION

Management for significant and common fauna across the site is addressed at the design,
construction and operational stage of the development. Specific management measures
(ie. those specified in the approval conditions and other standard best practice) are
discussed in further detail while the implementation of these measures in each stage and in
the appropriate management plans, is discussed in Section 4.0. These management
measures relate to the following areas:

*® areas subject to the Ecological Restoration Plan - including private open space for
conservation and waterways protection, park, environmental park, public esplanade and
road reserves - bushland; and

e areas subject to the Landscape Master Plan, including the development areas (referred
to as building envelopes in Figure 5) and road reserves - landscaped.

As previously stated, fauna management objectives are to

i) provide suitable sustainable habitat and linkages for all fauna adjacent to and
integrated with the development; and
ii) protect and manage fauna prior to and during clearing and construction.

3.2 PROVISION OF HABITAT AND LINKAGES
3.2.1 General Fauna Habitat

The overall philosophy for recreating sustainable and viable fauna habitat is to
restore/connect a number of vegetation communities across the site. The envisaged site
fauna habitats (or vegetation communities) are illustrated in Figure 6, described in the
Ecological Restoration Plan and include:

e Open eucalypt/cypress/banksia forest (higher slopes) with associated littoral rainforest
(on lower slopes);

e Open eucalypt/cypress/banksia forest with heath understorey;

e Swamp mahogany open forest;

e Paperbark open forest (forest red gum in parts);

e Heath-fern wetland;

e Artificial wetland; and

e Marine (saltmarsh and mangroves).

Plantings throughout the site ie. in the landscaping and restoration activities, will include
the use of plant species that provide habitat for a range of local common species (examples
are provided in Annexure 2).

 

FAUNA MANAGEMENT PLANSETTLER’S COVE DEVELOPMENT PTY LTD
MAY 2005
R79130 (70934)

C&B GROUP
Log in to download the original file

RFI - Ecological Assessment Report.pdf · 67.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.