Original source · versioned page text
RFI - Ecological Assessment Report
Very large file (67.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 182, section 1. The text section number identifies this passage in the reader.
ROLES AND RESPONSIBILITIES OF PERSONNEL INVOLVED IN ECOLOGICAL MANAGEMENT 1-9
be made available to the public during implementation of the ERP by means of a sign placed in a
clearly visible location near the main access point to the work site.
The ERP Contractor will establish a Complaints and Incidents Register and all legitimate and
verifiable complaints received will be investigated and logged into the Register, recording:
• date, time and method of complaint (e.g. phone, personal contact, letter);
• complainant details (name, address and contact details);
• nature of complaint;
• response initiated;
• action taken.
The objective is to process complaints as quickly as possible and in a consultative manner. The
complainant should be advised within 48 hours of the status of the investigation and the time frame
for resolution.
Significant complaints will be reported to Council’s nominated person and be included in monthly
reports.
1.8 Incidents Procedure
The ERP Contractor is to report any incidents of environmental damage (even where damage is
minimal) to the Project Manager. All incidents will be investigated and logged into the Register,
recording:
• date, time and nature of incident;
• impact of incident;
• response initiated;
• action taken (as recorded in Register);
• reporting to council/EPA undertaken; and
• on-going monitoring required.
Should a significant non-compliance incident occur, the Project Manager will be responsible for
notifying Council’s nominated person as soon as practicable, but no later than 12 hours after the
incident. Advice on action to be implemented should be taken from Council’s designated officer
and/or the EPA. Contact details for these agencies are to be confirmed prior to the commencement of
ERP implementation.
1.9 Monitoring of the ERP Implementation
Section 4.1.5 of the ERP provides details of the monitoring that will be required to be undertaken by
the ERP contractor.
S:\PROJECT MANAGEMENT\4.0 OVERALL DEVELOPMENT SITE\MANAGEMENT PLANS\EMP 3 (WBM OCEANICS).DOC 8/10/07 14:10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.