Original source · versioned page text
RFI - Ecological Assessment Report
Very large file (67.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 184, section 1. The text section number identifies this passage in the reader.
ROLES AND RESPONSIBILITIES OF PERSONNEL INVOLVED IN ECOLOGICAL MANAGEMENT 1-11
performance targets of this EMP and the ERP, and compliance with other Council requirements and
legislation.
The auditor shall produce a report as soon as possible following the audit, assessing compliance, with
comments on achievements and any non-conformances and forward copies to the Developer. The
reports shall also be made available for Council inspection and review every 12 months after the date
of commencement.
S:\PROJECT MANAGEMENT\4.0 OVERALL DEVELOPMENT SITE\MANAGEMENT PLANS\EMP 3 (WBM OCEANICS).DOC 8/10/07 14:10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.