RFI - Ecological Assessment Report

of 435

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (67.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 230, section 1. The text section number identifies this passage in the reader.

EMP DESIGN AND PRE-CONSTRUCTION                                                                               3-1


3       EMP DESIGN AND PRE-CONSTRUCTION
        Prior to the commencement of construction activities, designs for infrastructure and buildings and
        landscaping will need to be checked to ensure compliance with the environmental management
        objectives for the site. All building and landscaping designs are to be the subject of a design audit
        prior to submission to Council for approval. Audit reports are to be submitted to Council with
        applications. The audits should be based on the criteria /actions presented in Elements D.1 and D.2
        below.

3.1     Element D.1:                          Design Factors for Site Water
        Management
        Policy:            To protect aquatic ecosystems in the waterways and wetlands of the site and areas
                           adjoining the site, and the receiving waters of Noosa Inlet and the Noosa River through
                           the development of appropriate building/ landscape designs.To replicate naturally
                           occurring hydrogeological processes over the construction area of the site.



       Strategy:           To ensure no net reduction of rainwater infiltrating the sand dunes beneath the
                           site. To ensure adequate treatment of runoff from landscaped and hardstand
                           areas prior to infiltration.

        Responsibility: Consulting Engineer and Landscape Architect.

        Management Actions: All design within the Residential High Density areas to comply with the
        following guidelines.
       1. All runoff from storms up to 10 year average recurrence interval (ARI) to be infiltrated into the
          sand subgrade without runoff.
        2.    Infiltration to be achieved via swales and ephemeral streams and rapid infiltration pits (RIP’s)
        3.    All infiltration devices to be located within the “residential high density building envelope” as
              shown on Ken Hicks and Associates drawing 1128 Master.
        4.    Surcharge runoff from storms greater than the capacity of infiltration devices to be directed
              toward ecological restoration areas and roadways as dispersed sheet flow rather than
              concentrated flows.
        5.    Stormwater runoff from landscaped and hardstand areas to be pretreated prior to infiltration.
        6.    Runoff from roadways and landscaped areas to be directed to landscaped swales or ephemeral
              streams for biological treatment including vegetative plantings in accordance with the
              Landscape Master Plan.
        7.    Areas of swales and ephemeral streams shall be lined with a soil layer to retard infiltration and
              allow biological treatment of runoff. Soils will be remediated by mixing with loams to achieve
              a hydraulic conductivity of 100mm/hr.
        8.    Swales and ephemeral streams to be planted in accordance with approved Landscape Master
              Plan in order to promote biological treatment of runoff.

        G:\ADMIN\B15184.G.DAH\R.B15184.001.05..DOC 22/7/05 10:07
Log in to download the original file

RFI - Ecological Assessment Report.pdf · 67.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.