EMP DESIGN AND PRE-CONSTRUCTION                                                                               3-2

       Strategy:           To ensure no net reduction of rainwater infiltrating the sand dunes beneath the
                           site. To ensure adequate treatment of runoff from landscaped and hardstand
                           areas prior to infiltration.

        9.    Plant species utilised in landscaping to be predominantly native species indigenous to the site
              with low nutrient/fertiliser requirements in accordance with approved Landscape Master Plan.
        10. Runoff from internal driveways and pavements to be directed to propriety oil and sediment traps
            (SQID’s) prior to discharge to rapid infiltration pits.
        11. Runoff from roofed areas to be directed to rainwater storage tanks for the purpose of landscape
            irrigation.
        12. Irrigation systems to be drip-systems to maximize water conservation and minimize runoff into
            environmentally sensitive areas.
        13. Overflows from rainwater tanks shall be directed to rapid infiltration pits without further
            treatment.
        14. Rapid infiltration pits shall be fitted with geofabric filters to prevent localised “clogging” of the
            subgrade with leaf litter and humus.

       Performance Requirement: Ensure water quality management actions in accordance with this EMP
       and the approved Landscape Master Plan are incorporated within all future operational works
       applications for development of the site.

       Monitoring: The Landscape Architect and Design Engineer/Superintendent will check all future
       applications for compliance prior to lodgement with Council for approval.

       Reporting: To be incorporated within operational works applications to Council.

       Corrective Action: Amend designs to ensure compliance.


3.2     Element D.2:   Design Factors For Ecological
        Management Within RHD Area
        Policy:            To protect ecosystems and environmental values within the development area of the
                           RHD area through the development of appropriate building/ landscape designs.



       Strategy:           To ensure building and landscape designs incorporate appropriate measures
                           consistent with the intent of site environmental protection.

        Responsibility: Design Engineer, Landscape Architect, Wildlife Ecologist and Architect.

        Management Actions: All design within the Residential High Density areas to comply with the
        following guidelines:
       1. The Landscape Master Plan provides overall protocols for design.
       2. Buildings, internal roads and fences shall be sited and constructed to allow movement of fauna


        G:\ADMIN\B15184.G.DAH\R.B15184.001.05..DOC 22/7/05 10:07
Log in to download the original file

RFI - Ecological Assessment Report.pdf · 67.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.