RFI - Ecological Assessment Report

of 435

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (67.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 244, section 1. The text section number identifies this passage in the reader.

EMP – CONSTRUCTION PHASE                                                                                 4-10

4.3     Element C.3:    Fauna and Fauna Habitat and
        Aquatic Ecosystem Protection
        Policy:            To minimise the impacts of fauna during clearing operations and ensure protection of
                           adjacent habitat. (refer Conditions 19, 33-39, 50-55; Nature Conservation Act1992).



       Strategy:           Minimise potential adverse impacts on fauna.



        Responsibility: Principal Contractor/SEO/Wildlife Ecologist.

        Management Actions:
       1. The Fauna Management Plan outlines management strategies to be implemented during the
          Construction program.
       2. The Nature Conservation Act 1992 and the Nature Conservation (Wildlife) Regulation 1994
          requires that protected animals whose habitat has been destroyed by human activities or natural
          disasters are cared for and rehabilitated.
       3. Site personnel are to be advised during training that all native fauna is protected. The specific
          presence of koalas and other threatened species and their management are to be described.
       4. The SEO will ensure that all construction and associated personnel are familiar with management
          conditions relating to the protection of native fauna within the proposed development area. This is
          to be facilitated through the Induction/Environmental Awareness training. Regular
          monitoring/inspections would be undertaken to ensure all appropriate measures are complied with
          to minimise potential negative impacts on native fauna within the development area.
       5. During site clearing, the Wildlife Ecologist will ensure that a qualified personnel (as per Appendix
          A) will be present with a minimum of EPA licence and Fauna Ethics number.

       The Vegetation Retention and Clearing Strategy (Element C.2 and Appendix C) provides the direction
       in regard to fauna protection during the site clearing activities to be undertaken in both the RHD and
       RSL areas. Compliance with this strategy is a critical component of the environmental management at
       the Settlers Cove site. The Fauna Management Plan provides further detail in regard to fauna
       protection strategies during the site clearing program.

        Performance Requirement:

        •    Ensure that best practice is used to minimise potential adverse impacts on fauna and that habit
             values of the wider site are protected

        •    No death to native fauna with injuries minimised.

        Monitoring: All staff and contractors to report any occurrences of injured fauna to SEO. Any fauna
        collected and relocated are to be documented including species and location and date of release.

        SEO to actively monitor effectiveness of measures in regard to impacts on native fauna. Capture and


        G:\ADMIN\B15184.G.DAH\R.B15184.001.05..DOC 22/7/05 10:07
Log in to download the original file

RFI - Ecological Assessment Report.pdf · 67.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.