Original source · versioned page text
RFI - Ecological Assessment Report
Very large file (67.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 245, section 1. The text section number identifies this passage in the reader.
EMP – CONSTRUCTION PHASE 4-11
Strategy: Minimise potential adverse impacts on fauna.
release records will be maintained by the SEO (in consultation with the Wildlife Ecologist)
Reporting: “End of Stage” report to be provided to Superintendent and made available to Council in
accordance with ECR reporting (Section 1.9).
Corrective Action: Liaison and advice from Wildlife Ecologist or QPWS as necessary.
4.4 Element C.4: Weed and Pest Control
Policy: To control the introduction and spread of weed and pest species as a result of
construction works. (refer Conditions 12, 40-46, Land Protection (Pest and Stock
Route Management)Act 2000, Council Weed Control Policy).
Strategy: Prevent introduction of new weed species or proliferation of pests as a
result of construction works.
Responsibility: Site Environmental Officer and Principal Contractor.
Management Actions:
1. Prior to commencement of clearing, weed species are to be identified by the Wildlife Ecologist.
2. All weeds within the construction area are to be treated and/or removed from the property.
3. All construction machinery entering the site shall be free of soil, weeds, soil pathogens and pest
species.
4. A vehicle wash down facility will be established at the entry/exit point to the site (in accordance
with engineering specifications) and is to be used by all earthmoving machinery prior to entering
the site.
Earthmoving machinery to be used at the site and coming from other regions external to the North
Coast (including from potential fire ant areas in the Brisbane region) will be required to be washed
down at an existing operation external to the site and approved by Council and/or DNRM. All
such machinery will be required to have a wash down certificate signed by the facility operator.
No earthmoving machinery originating from other regions will be permitted onto the site without
this certificate.
5. No soil disturbance, weed or pest control is to occur outside the designated RHD construction
area.
6. All nursery stock shall be weed, pest and disease free and certified as such by the supplier . The
certificates are to be obtained prior to the commencement of any landscaping works on site and
shall be made available to Council upon request (refer Landscape Master Plan). All fill
material, topsoil, mulch and other such material brought onto the site is also to be certified as
weed, pest and disease free by the supplier.
7. All fill material, topsoil, mulch and other such material brought onto the site is also to be certified
G:\ADMIN\B15184.G.DAH\R.B15184.001.05..DOC 22/7/05 10:07
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.