EMP – CONSTRUCTION PHASE 4-14
Strategy: To ensure that erosion and sedimentation is adequately controlled during the
construction phase.
• Stormwater is treated as close as possible to the source (as opposed to at the lower areas of
the catchment);
• Clean stormwater is to be diverted around construction areas of the site including any waste
or chemical storage areas, stockpiles and toilets;
• All surface runoff shall be directed through temporary control measures to minimise
potential for sediment transport off-site;
• Any sediment control measures are to avoid significant trees and retained vegetation;
• Any catch drains flows are directed through temporary control measures and toward
sedimentation ponds;
• Any catch drains will be protected from scour by check dams or similar devices aimed at
reducing water velocities;
• Installation of controls on the upstream and downstream side of any stockpiles or fill
embankments;
• Removal and appropriate disposal of deposited material, litter and gross pollutants;
• Inspections of erosion and deposition is to be conducted on a weekly basis and following
storm events that have the potential to cause erosion i.e. normally events with a rainfall
intensity greater than 25mm/hr or daily events with totals greater than 50mm.
• Erosion and sediment control measures will be implemented in areas prior to
commencement of any construction activities. This includes:
a. Designating areas for machinery and construction material storage (as required) away
from drainage paths;
b. Such storage areas are to be suitably bunded and lined to prevent seepage of
contaminants into the sand substrate (see C.15);
• Education of site personnel through the Induction/Environmental Awareness training;
• Construction of sedimentation detention areas as required;
• Installation of vehicle washdown facility at site access points to minimise potential for
transport of sediment off site; and
• No sediment and erosion control devices and water quality control measures are to be
located within habitat protection areas (refer approved E&SC drawing provided by
Superintendent).
• The use of mulch for erosion control is described in the Landscape Master Plan including
the use of Hoop Pine bark for slopes greater than 1:3.
Performance Requirement:
• To ensure measures taken to reduce risk of erosion are in accordance with best practice
guidelines (I E Aust 1996), minimise the generation of sediments and prevent off-site
transport of sediments during construction.
G:\ADMIN\B15184.G.DAH\R.B15184.001.05..DOC 22/7/05 10:07
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.