RFI - Ecological Assessment Report

of 435

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (67.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 262, section 1. The text section number identifies this passage in the reader.

EMP – CONSTRUCTION PHASE                                                                                    4-28

       Strategy:           To ensure that any community feedback or complaint is responded to and
                           addressed appropriately.

       4.     Action taken.

       Response to an investigation undertaken as a result of community feedback investigation and
       signature of responsible person. Complaints are to be recorded in the ECR.

       Corrective Action: Submit relevant forms to Council. Response to be as directed (refer specific
       element)

4.13 Element C.13: Construction Management Plan
        Policy:            To provide a safe environment in the vicinity of the site during the construction phase
                           that has minimal effect on the amenity of existing residents living nearby (refer
                           Occupational Health and safety guidelines, EP Act regarding ‘nuisance’).



       Strategy:           To ensure all measures are taken to prevent unnecessary accidents involving
                           Employees or the public in the vicinity of the construction site and to minimise
                           nuisance to residents living around and adjacent to the construction site.

       Responsibility: Principal Contractor and Site Safety Officer (as designated).

       Management Actions:
        1.    All accidents and injuries must be reported immediately to the designated Site Safety Officer.
              Any serious work-related injuries, illnesses or dangerous occurrences must be reported
              immediately to Work Cover Queensland.
        2.    Contractors must comply with relevant Qld Government Occupational Health and Safety
              Guidelines.
        3.    Temporary fencing will be installed around unfenced parts of the site during the construction
              phase.

       Machinery

        1.    All machinery employed in construction shall be appropriately registered well maintained and in
              roadworthy condition (where applicable).

        2.    All machinery operators and subcontractors employed in construction works shall be
              appropriately qualified, licensed and experienced in the type of works being undertaken.

       Access
        1.    A detailed traffic management plan produced by a suitably qualified consultant is to be
              submitted to Council prior to the pre-start meeting as per condition 140.
        2.    Trucks accessing the site shall predominantly be routed along Noosa Drive, Grant Street and
              Serenity Close.



        G:\ADMIN\B15184.G.DAH\R.B15184.001.05..DOC 22/7/05 10:07
Log in to download the original file

RFI - Ecological Assessment Report.pdf · 67.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.