Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

RFI - Ecological Assessment Report

of 435

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (67.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 269, section 1. The text section number identifies this passage in the reader.

OPERATIONAL PHASE                                                                                          5-1


5       OPERATIONAL PHASE
        This section of the EMP has been broken into the following elements:

        5.1            Element O.1              Advice to Bodies Corporate


        5.2            Element O.2              Stormwater and Water Quality Management

                                                Management of Private Open Space for Conservation and
        5.3            Element O.3
                                                Waterways protection

        5.4            Element O.4              Protection of Native Fauna


        5.5            Element O.5              Fire Management


        5.6            Element O.6              Landscape Management

5.1     Element O.1: Advice for Bodies Corporate
        Policy:            To ensure that all future bodies corporate and residents are aware of the
                           environmental values of the Settlers Cove site and its surrounding habitats and their
                           responsibilities as future residents of this area.



       Strategy :             Develop an information kit for bodies corporate and future residents.



       Responsibility: Developer and Bodies Corporate.

       Management Actions: This EMP contains a number of actions, which are required to be
       implemented by bodies corporate and individual property owners and occupiers. While some aspects
       of ongoing management will be contained within the environmental covenant, many of the
       requirements and responsibilities will stem directly from this EMP and associated management plans.
       Accordingly, this section of the EMP is to be attached to Community Management Statement (CMS)
       for each of the lots. In addition, a Fire Management Plan (incorporating a Bushfire Information Kit)
       will be provided to each of the Bodies Corporate. This will be prepared for each of the lots at the
       Operational Works landscaping phase.

       The Environmental Covenant will present the obligations of the bodies corporate in regard to
       management of vegetation in the POSCWP area within each of the lots.

       Information to be incorporated into the CMS is to include:
        1.    Information on the environmental values of Settlers Cove area and the private conservation areas.
        2.    Recommended Landscaping species and landscaping/garden maintenance.


        G:\ADMIN\B15184.G.DAH\R.B15184.001.05..DOC 22/7/05 10:07
Log in to download the original file

RFI - Ecological Assessment Report.pdf · 67.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.