Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

RFI - Ecological Assessment Report

of 435

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (67.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 270, section 1. The text section number identifies this passage in the reader.

OPERATIONAL PHASE                                                                                              5-2

       Strategy :             Develop an information kit for bodies corporate and future residents.


        3.    Requirements in relation to stormwater management and water harvesting, including the
              installation and maintenance of rainwater tanks and the appropriate maintenance and care of on
              site stormwater treatment devices and water quality management.
        5.    Measures which can be undertaken by bodies corporate and individuals to protect flora and fauna
              within the area.
        6.    Fire Management Requirements and recommendations (including the Bushfire Information Kit);
        7.    Any other relevant recommendations of subsequent conditions of approval or Management
              Plans.

       Performance Requirement: All bodies corporate and property owners are aware of their
       environmental responsibilities as residents of this area. Community Management Statement
       provisions and environmental covenant complied with.

       Corrective Action: The CMS and associated information described above to be reviewed at periodic
       intervals during the life of the release of the development to ensure that up to date and relevant
       information is provided.

5.2     Element O.2: Stormwater and Water Quality
        Policy:             To ensure the protection of aquatic ecosystems in the waterways, wetlands and wet
                            heath lands of the site, areas adjoining the site, and the receiving waters of Noosa
                            Inlet and the Noosa River.
                           To replicate naturally occurring hydrogeological processes over the development area
                           of the site.



       Strategy:           Implement appropriate inspection and maintenance regimes to ensure optimum
                           ongoing function of all stormwater and water quality maintenance features.

       Responsibility: Developer (during maintenance period), Body Corporate ( Maintenance Manager) and
       Council (within road reserve).

       Management, monitoring and remediation actions:
       •      Community Management Statements (CMS) for all allotments for the Operational phase will
              include requirements for the maintenance and servicing of rapid infiltration pits and SQID’s.
       •      Community Management Statements (CMS) for all allotments will include requirements for
              fertilising/maintenance of general landscape areas and swales/ephemeral streams.
       •      It needs to be noted that the servicing of rapid infiltration pits should be carried out by a person
              who has undertaken a Confined Spaces Approved Training Course.




        G:\ADMIN\B15184.G.DAH\R.B15184.001.05..DOC 22/7/05 10:07
Log in to download the original file

RFI - Ecological Assessment Report.pdf · 67.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.