Skip to the record
Every meeting, every word.

Original source · versioned page text

RFI - Ecological Assessment Report

of 435

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (67.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 272, section 1. The text section number identifies this passage in the reader.

OPERATIONAL PHASE                                                                                           5-4

       Strategy:           Implement appropriate inspection and maintenance regimes to ensure optimum
                           ongoing function of all stormwater and water quality maintenance features.

       All SQID’s to be inspected, cleared and serviced in accordance with manufacturer’s
       recommendations.

       Council

       Monitoring and management of the rapid infiltration pits and swales within the road reserve to be
       undertaken generally in accordance with the above procedures where applicable.

       Reporting:

       Developer
        1.    Reporting of surface water monitoring and infiltration pit monitoring will be provided to Council
              every 3 months with any departures from acceptable compliance levels highlighted and
              evaluation/ remediation measures undertaken.

       Bodies Corporate
        1.    The maintenance manager shall keep a diary recording dates and details of all inspections,
              servicing and remedial works carried out on landscaped areas, rapid infiltration and SQID’s (to
              be defined in Community Management Statement).
        2.    Copies of the diary shall be forwarded to the secretary of the body corporate on a three monthly
              basis. This shall be available for viewing by Council on request.

       Corrective Action:

       Developer
        1.    Corrective action shall occur when a non-compliance with water quality criteria has been
              identified.
        2.    Council shall be notified of any incidents immediately.
        3.    Corrective action can involve revision of landscape maintenance and fertilizing procedures,
              revision of SQID and rapid infiltration pit maintenance procedures (as identified below).

       Bodies Corporate

       The following will be defined in the Community Management Statements:
        1.    Clear all debris from grated inlets and base of pits as necessary.
        2.    Replace upper geofabric filters if ponding of water in pits is noted.
        3.    Contact project engineer if evidence of pit surcharge or scour is noted.
        4.    A qualified landscape architect is to be engaged should the performance of swales and other
              landscaping fail to meet management objectives.




        G:\ADMIN\B15184.G.DAH\R.B15184.001.05..DOC 22/7/05 10:07
Log in to download the original file

RFI - Ecological Assessment Report.pdf · 67.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.