Skip to the record
Every meeting, every word.

Original source · versioned page text

RFI - Ecological Assessment Report

of 435

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (67.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 274, section 1. The text section number identifies this passage in the reader.

OPERATIONAL PHASE                                                                                            5-6
        of the swales as this will impact upon their water quality improvement function. Photographs of
        swale elements requiring remediation should be taken prior to and following corrective actions.

        Maintenance of subsurface drainage shall be in accordance with stormwater management guidelines
        as described in the EMP.

        The above swale maintenance regime is to be conducted during the first two years during plant
        establishment. Swale maintenance for 12 months after practical completion and on-maintenance
        certification shall be the responsibility of the developer. Thereafter on-going maintenance (following
        successful off-maintenance certification by council) will be the responsibility of council.

        Following the 2 year establishment period, monitoring and maintenance visits can be reduced to
        every 2 months during summer and spring and 3 monthly during the cooler autumn and winter
        periods, although mowing of grassed sections shall still follow the establishment period regime.
        Inspections shall also continue to follow heavy rains.

        Refer to Maintenance Regime table below.

        Swale Maintenance Regime
        Period after Swale Construction                            Inspection frequency
        First 12 months (on maintenance period by                  Monthly (spring & summer months)
        developer)                                                 Every 2 months (autumn & winter months)
        Second year – hand over to council                         Monthly (spring & summer months)
        (following off maintenance certification)                  Every 2 months (autumn & winter months)
        Third year & beyond – by council                           Every 2 months (spring & winter months)
        (Note: mowing to continue as first 2 years)                Every 3 months (autumn & winter months)
        Heavy rain events                                          Inspect following event as required




        G:\ADMIN\B15184.G.DAH\R.B15184.001.05..DOC 22/7/05 10:07
Log in to download the original file

RFI - Ecological Assessment Report.pdf · 67.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.