Original source · versioned page text
RFI - Ecological Assessment Report
Very large file (67.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 275, section 1. The text section number identifies this passage in the reader.
OPERATIONAL PHASE 5-7
Swale Maintenance Checklist:
Inspection Number:
Location RSL / RHD:
Description:
Site Visit by:
Inspection Items Y N Action Required
(other details)
Gross Pollutants – Litter Collect & remove
& debris etc.?
Sediment deposits / Excavate & remove
accumulation?
Evidence of erosion? Rectify & prevent
reoccurrence
Ponding evident?(how Re establish design
long since last rain flow / infiltration
event)?
Weed growth Remove weeds (No
evident(type, density, herbicides)
seeding etc.)?
Native Vegetation Treat diseased plants,
condition satisfactory prune as required (No
(density & health)? chemicals or fertilisers)
Replanting required? Replace dead plants
with approved species
Mowing required? Mow (condition must
be dry) orbrushcut
(remove all cuttings)
Grass condition? Repair as required(No
chemicals or fertiliser)
Damage or vandalism Repair as required
present?
Infiltration pits Follow infiltration pit
inspected? inspection procedure
Other or repeated Report, determine
occurrences? cause & rectify
Photographs taken of Prior to corrective
swale elements action -Following
requiring remediation? corrective action -
Comments:
G:\ADMIN\B15184.G.DAH\R.B15184.001.05..DOC 22/7/05 10:07
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.