(e.g. conservation/retained vegetation areas) determined in consultation with QPWS
and/or other relevant authorities. Any person involved in capture/relocation should be
accredited by the QPWS.
27. If any denning animals are observed within hollow limbs, but cannot be readily removed,
it is recommended that, where appropriate, the hollow end of the limb be blocked with
porous material and a chainsaw be used to remove the limb. The limb should be relocated
to a suitable place, determined in consultation with QPWS, where necessary, followed by
appropriate fauna release measures.
28. Prior to tree removal, the Wildlife Ecologist should attempt to “flush out” any denning
animals not observed during the initial hollow inspection.
29. A second inspection following the felling of each tree will recover fauna that are disturbed
by the clearing process or are remaining within the felled timber. Recovered fauna will be
relocated to a suitable location determined in consultation with QPWS. All injured animals
should be immediately removed and taken to an appropriately qualified wildlife veterinary
surgeon (eg. Noosa Veterinary Surgery, Tewantin).
30. Where possible, the felling of the habitat trees should be conducted in a manner that
maximizes the chances of survival for any fauna remaining within the tree hollows. This
may involve pushing rather than cutting and cushioning the tree fall with other felled
timber and foliage. It is recommended that, where feasible, habitat trees not be drop felled,
and a more appropriate and sensitive means of clearance for these trees be utilised eg.
Excavator.
31. Hollow limbs and logs identified prior to clearing by the Wildlife Ecologist as worthy of
protection are to be salvaged following tree removal.
32. Nest boxes erection considerations are described in the Fauna Management Plan.
33. Following completion of the stage works, capture and release records will be supplied to
the SEO for dissemination to QPWS, where required.
34. No dogs or cats or other pets shall be permitted on site during construction/clearing
program.
35. All mulch produced on site by mulching cleared vegetation and trees shall specifically
exclude propagative material from weed species. Cleared vegetation which contains
weeds, is to be disposed of at a Council approved facility.
36. All disturbed earthworks areas are to be temporarily stabilised by mulching with material
produced from native vegetation cleared from the site (refer Landscape Master Plan). Any
exposed areas are to be stabilized within two weeks of clearing.
37. Mulch stockpiles are not to exceed 2 m high, be located no closer than 10m from habitat
protection areas.
38. The speed of machinery used for clearing is not to exceed 30kph on site.
39. The site is revegetated as soon as practicable after clearing. All revegetation within the
RHD construction area shall be carried out in accordance with Landscape Master Plan;
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.