SETTLERS COVE NOOSA
Landscape Master Plan

 

Pathway with the 2 metre wide pathway to be provided along the eastern side of Banksia
Avenue (and linking with Grant Street).

126. The 3 metre wide Multi Purpose Pathway (as briefly mentioned above) shall be
constructed from concrete, generally around the perimeter of the Residential High
Density development utilising the existing cleared areas over Council's sewer main.

The path shall be designed and constructed as a Multi Purpose Pathway for fire fighting
purposes (fire break / fire access) and for pedestrians and cyclists to use. To this extent
the path shall commence from the 2 metre wide path (around the back of the proposed
cul-de-sac / turning facility at the Grant Street intersection) and shall wrap around the
bottom of the Residential High Density allotments to link with the future boardwalk (which
will tink with the future Jetty to be provided by the applicant in Noosa Inlet) or unless
otherwise approved by the Manager of Land Development.
The actual alignment of the pathway shall be chosen in consultation with Council’s Land
Development Section and Council's Water Supply & Sewerage Section to avoid the risk
of any damage occurring to Council’s infrastructure. In this regard an on-site meeting
with the approved contractor and representatives from both the Land Development and
Water Supply & Sewerage sections of Council shall be arranged by the applicant after
the alignment of Council's sewer main has been accurately surveyed and located on site.
As this pathway will also be used for fire access the applicant shall ensure that
appropriate cover is maintained to the sewer main to allow for vehicle loads.

127. A1.5 metre wide link path shall be provided between proposed Lots 9 & 10 within a 4
metre wide road reserve — linking the cul-de-sac in Serenity Close with the 3 metre wide
Multi Purpose Pathway around the perimeter of the Residential High Density
development. In addition to this a 1.5 metre wide link path shall be provided between
proposed Lots 10 & 11 within the existing sewer easement linking the future development
within Lots 10 & 11 with the 3 metre wide Multi Purpose Pathway around the perimeter of
the Residential High Density development.

128. In choosing the alignment of all these paths care shall be taken to protect any significant
vegetation or any underground services. :

133. Prior to works being taken “On Maintenance”, the remainder of the footpath areas shail
be topsoiled and established with couch free of weeds, where consistent with the
Landscape Master Plan.

 

LandGraphics Maroochydore 04.05.2005
Landscape Architects and Environmental Planners PAGE 48
Log in to download the original file

RFI - Ecological Assessment Report.pdf · 67.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.