RFI - Ecological Assessment Report

of 435

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (67.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 78, section 1. The text section number identifies this passage in the reader.

                                                                                       2008/176



      stormwater management plan and stormwater management design must be prepared by a
      RPEQ, specialising in stormwater and water quality management incorporating the principles
      of the relevant approved Management Plans as described in Decision Notice 23118 DA. The
      stormwater management plan and stormwater management design must demonstrate water
      reuse strategies, infrastructure capacity and effective treatment methodology. The use of
      rainwater harvesting tanks for irrigation purposes shall be incorporated in the overall design
      plans. The following information is required to be submitted with the stormwater management
      plan and stormwater management design submitted with the application for Operational Works
      Approval:
      a.    An Audit report which confirms that the stormwater design achieves all criteria and
            actions specified in Elements D.1 of Settlers Cove Noosa Residential High Density
            Environmental Management Plan by WBM dated 25 July 2007;
      b.    Confirmation from an RPEQ that the sites proposed stormwater management measures
            will provide for infiltration into the sand subgrade without runoff for storms up to a 10
            year Average Recurrence Interval;
      c.    The location for any required oil and sediment traps; &
      d.    MUSIC model results that demonstrate that the site will achieve the pollutant reduction
            targets required by the Water Sensitive Urban Design Technical Design Guidelines and
            the following water quality criteria:
            i.     Total nitrogen levels – 0.34 mg/l; &
            ii.    Total phosphorous levels – 0.035 mg/l.
59.   All stormwater drainage shall be collected on site and discharged so there is no net increase
      in stormwater runoff from the site.
60.   To ensure that polluted run-off does not enter the water table, the adjoining waterways or
      Council’s stormwater drainage system, stormwater run-off from the car parking areas and the
      driveways shall have the first flush (the first 12 mm of rainfall or hose-down) collected in a
      grease/oil arrestor/gross pollutant trap provided on site prior to being permitted to discharge
      into the larger drainage system.
      All other clean stormwater, such as roof water, can be collected on site and discharged
      through a single underground drain line directly into the existing drainage system, bypassing
      the grease/oil arrestor/gross pollutant trap.
      To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil
      arrestors/gross pollutant trap, which shall be submitted to the Council for approval prior to
      obtaining a Development Permit for Operational Works.
      The approved maintenance plan shall be incorporated in the Community Management
      Scheme for the development and a copy of this shall be provided for Council’s records prior to
      commencement of the approved Use.
61.   A Development Permit for Building Works shall not be granted until a Development Permit for
      Operational Works has been issued in regard to the drainage scheme.
62.   All site stormwater drainage shall be by means of a gravity system.
63.   All stormwater drainage lines including inter-allotment drainage shall be inspected by closed
      circuit television (CCTV) prior to commencement of the approved Use.
      CCTV inspection will be carried out by Council's CCTV contractor and arranged by Council
      following satisfactory completion of construction works. The developer will be responsible for
      the full cost of CCTV inspection, including any additional inspection necessary following defect
      identification and rectification. This charge is payable prior to the issue of Operational Works
      approval and will be determined on the unit rate basis current at the time of approval.

                                                                                    Page 8 of 30
Log in to download the original file

RFI - Ecological Assessment Report.pdf · 67.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.