Skip to the record
Beware of cheap imitations.

Original source · versioned page text

RFI - Ecological Assessment Report

of 435

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (67.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 79, section 1. The text section number identifies this passage in the reader.

                                                                                         2008/176



Sewer Mains / Town Water Supply
64.   Reticulated water supply and sewerage must be provided to the development.
65.   Construction activities must not impede the access of Sunshine Coast Water or Fire Brigade
      personnel to vital infrastructure (eg. valves, fire hydrants and sewer access chambers).
66.   The fire-fighting demand on Council’s water supply system from the development must not
      exceed 30 litres per second.
67.   A single Council installed primary water meter must be provided immediately inside the
      property boundary. Additional water meters must be installed for each title of a community title
      or sub-lease scheme. Meters must be Council approved, installed in accordance with Council
      requirements and remain accessible at all times for reading and maintenance purposes.
68.   Buildings, basements and other structures must maintain a minimum clearance of 1.5 metres
      from Council sewer mains, and 1.0 metres from sewer manhole chambers and inspection
      openings.
69.   Storm water retention systems, gross pollutant traps and bio-retention basins must maintain a
      minimum clearance of 1.5 metres from Council water supply and sewerage infrastructure.
70.   Landscape planting within 1.5 metres of Council sewerage infrastructure must be Council
      approved varieties and low growing when mature.
71.   The level of the existing sewer manholes must be adjusted to suit the proposed finished
      surface levels. Work must be undertaken by Sunshine Coast Water at the applicants cost.
72.   Landscape planting within 1.5 metres of Council sewerage infrastructure and 1.0 metres from
      water supply infrastructure must be Council approved varieties and low growing when mature.
73.   Construction works undertaken in the vicinity of Council water supply or sewerage
      infrastructure must not adversely affect the integrity of the infrastructure. All costs associated
      with repair, replacement or alteration of infrastructure must be met by the applicant.
Service Easements (Sewer / Stormwater)
74.   A 3.0 metre wide easement must be provided over all Council sewers located in private
      property that are not covered by an existing easement. A 4.0 metre wide easement must be
      provided over Council sewers greater than 3.0 metres deep (where approved by Council).
      Easements must be located centrally over the main.
75.   A registered easement shall be created over any stormwater drainage pipes within the site
      that collect stormwater from a Council road or convey stormwater from any adjoining property
      (for example, where drainage pipes are provided within the site to prevent adjacent properties
      from additional ponding/flooding due to the subject site being filled).
76.   No building or other structure shall be constructed or encroach into an easement.
Construction Issues
77.   A Traffic Management Plan for the each construction phase of the development shall be
      submitted to and approved by Council at least 5 working days prior to the commencement of
      any Building works or at least 5 working days prior to the pre-start meeting for Operational
      Works. The Traffic Management Plan shall be referred to the Divisional Councillor for
      comment before approval and shall include but not be limited to:

      a.    Limiting the routes for the heavy vehicles to the major road network and prohibit the use
            of the local roads as access to the site.
      b.    Indicate provision for on-site and off-site parking for the required workforce.
      c.    Indicate the location of loading and unloading areas.
      d.    Indicate the location of any “holding” areas for heavy vehicles, and
      e.    Operating hours.
      f.    Maintaining clear pedestrian access around the site at all times.
                                                                                      Page 9 of 30
Log in to download the original file

RFI - Ecological Assessment Report.pdf · 67.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.