1-22276 Page | 10
February, 20
020
Ref: 1-22276,
6, 2020-02-28, BR VE
ER 2
Wessel Petrooleum Pty Ltd – GE
EOTECHNICAL INVE
ESTIGATION - Propo
osed Service Statio
on Reconstruction, 52-54 Mary Street aand Weyba Road,
Noosaville
TABLE
E 1C QUAANTITATIV VE TEST RE ESULTS
Depth Range
R Nett Acidity
Borehhole No. T
TAA (mol. H+/t) SC
Cr (mol. H+//t)
(m
m) (mool. H+/t)
0.11 – 0.70 1 – 10 3 3 – 12
1.00 – 1.20 31 2 33
1
1.50 – 3.75 1-12 3 – 103 4 – 115
4.00 – 4.25 4 32 36
0.00 – 1.00 13 – 255 3.7 20 – 28
6 1.75 – 3.00 5 – 28 74 – 103 102 – 108
4.25 – 4.50 1–5 33 - 34 34
3 - 39
Where:
Depths in metres
m below surface leevel at datee of drilling
TAA = Titraatable Actuaal Acidity
SCr = Chro omium Redu ucable Sulfa ar
All S-NAS (Retained
( Acidity)
A ults not appropriate
resu
5.0 G
GEOTECHN
NICAL MO
ODEL
5.1 Subsurfac
ce Profile
The boreholes were positione ed in existin
ng pavemen
nt areas (BH’s 1, 2, 3,, 5, 7, 8 and 9) and in
n
garden beds (BH’ss 4 and 6). Refer
R to Pla
ate 3.
PLATE 3
SO
OIL SUR
RVEYS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.