Original source · versioned page text
1-22276-01 site plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn NOTES RELATING TO THIS REPORT
September, 2019
review the report and the sufficiency of the investigation complex, it is prudent to have a joint design review which
work. involves a senior geotechnical engineer. We would be happy
to assist in this regard as an extension of our investigation
Every care is taken with the report as it relates to
commission. Construction drawings should be reviewed by
interpretation of subsurface conditions, discussion of
Soil Surveys Engineering, with sufficient time to allow
geotechnical aspects and recommendations or suggestions
changes if required, prior to inspections. Otherwise Soil
for design and construction. Since the test sites in any
Surveys Engineering reserves the right to refuse to carry out
exploration represent a very small proportion of the total site
inspections.
and since the exploration only identifies actual ground
conditions at the test sites, even under the best SITE INSPECTION
circumstances actual conditions may vary from those
The Company will always be pleased to provide engineering
inferred to exist. No responsibility is taken for:-
inspection services for geotechnical aspects of work to which
Unexpected variations in ground and/or groundwater this report is related.
conditions.
i. Site visits during construction to confirm reported
Changes in policy or interpretation of policy by statutory ground conditions
authorities. ii. Site visits to assist the contractor or other site
personnel in identifying various soil/rock types such
The actions of other persons.
as appropriate footing or pier founding depths, the
Any work where the company is not given the stability of a filled or excavated slope; or
opportunity to supervise the construction using the iii. Full-time engineering presence on site.
Companies designs/recommendations.
In the vast majority of cases it is advantageous to the
If differences occur, the Company will be pleased to assist principal for the geotechnical engineer who wrote the
with investigation or advice to resolve any problems investigation report to be involved in the construction stage
occurring. of the project.
SITE ANOMALIES The geotechnical engineer cannot take responsibility for
variations in encountered conditions, where he is not given
In the event that conditions encountered on site during the opportunity to review plans for the proposed
construction appear to vary from those expected from the development with sufficient time to allow review and make
information contained in the report, the Company requests changes to the proposed development if required, and where
that it immediately be notified. Most problems are more he is not given the opportunity to inspect the site and
readily resolved when conditions are exposed than at some oversee construction methods with regard to site conditions
later stage, well after the event. with sufficient time to observe all relevant site conditions and
Extreme events including but not limited to the results of operations.
climate change, e.g. flood levels above previously identified RESPONSIBLE USE OF GEOTECHNICAL
levels, beach scour or erosion beyond normal expectations
(as identified by local authorities) extreme rainfall events, INFORMATION
war, espionage, sabotage may result in different conditions Recommendations in our report are for design purposes only
between time of investigation and time of construction. and provided on the basis that inspections are carried out to
allow finalisation of opinions and recommendations
REPRODUCTION OF INFORMATION FOR
contained in our report.
CONTRACTUAL PURPOSES
The geotechnical investigation consisting of field and
Attention is drawn to the document “Guidelines for the laboratory testing has been carried out to indicate typical
Provision of Geotechnical Information in Construction conditions by indicating conditions and parameters at the
Contracts (1987)”, published by the Institution of Engineers, specific locations of boreholes/test pits. Subsurface
Australia. Where information obtained from this investigation conditions are indicated at these locations only and the
is provided for tendering purposes, it is recommended that all inference of conditions between or away from these locations
information, including the written report and discussion, be (interpolation and extrapolation) involves a certain degree of
made available. In circumstances, where the discussion or risk. Persons inferring such conditions or carrying out such
comments section is not relevant to the contractual situation, inferences should do so with a degree of caution and
it may be appropriate to prepare a specially edited conservatism which is commensurate with the consequences
document. The Company would be pleased to assist in this of the risk of error.
regard and/or to make additional report copies available for
contract purposes at a nominal charge. Estimates of volumes based on our findings require
interpolation and extrapolation between test locations and as
REVIEW OF DESIGN such may be significantly different from actual volumes.
Where major civil or structural developments are propose or
where only a limited investigation has been completed or
where the geotechnical conditions/ constraints are quite
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.