1-22276-01 site plan

of 69

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Project No. 1
            1-22276                                                                                                                    Page | 2
February, 20
           020
Ref: 1-22276,
           6, 2020-02-28, BR VE
                              ER 2
Wessel Petrooleum Pty Ltd – GE
                             EOTECHNICAL INVE
                                            ESTIGATION - Propo
                                                             osed Service Statio
                                                                               on Reconstruction, 52-54 Mary Street aand Weyba Road,
Noosaville




3.0 P
    PROPOSED
           D DEVELO
                  OPMENT
It is und
        derstood that the proposed re-devvelopment is to consis st of the demmolition of the
                                                                                          t existing g
BP Serrvice Stationn and the adjacent
                              a        retaail site (Bud
                                                       dget Rentall). A new seervice statio
                                                                                          on will then
                                                                                                     n
be consstructed, exxtending ove
                              er both sitess.

It is und
        derstood tha
                   at the propo
                              osed re-devvelopment is
                                                    s to consist of:-

          Service sta
                     ation building, incorpora
                                             ating retail shop,
                                                          s     back of house, ooffice and am
                                                                                            menities
           areas
                   ea
           Refuse are
          Canopy witth associate
                                ed bowsers , etc.
          Undergroun
                    nd fuel tank
                               ks and asso
                                         ociated serv
                                                    vices
          Auxiliary pits, tanks, se
                                   ervices, sig ns, etc.
          Extensive pavement
                     p        areas
                              a
          Landscapin
                    ng

Structurral loads would
                  w     not be expecte
                                     ed to exceed standarrd residentiial single storey
                                                                                s      type
                                                                                          e
construction loads.

Earthwoorks are unknown,
                u        however pro
                                   oposed lev
                                            vels are ex
                                                      xpected to approxima
                                                                         ate existing
                                                                                    g
surface
      e levels.

Detailed
       d excavatio
                 ons of the orrder of 4.0m
                                         m to 4.5m arre expected
                                                               d for the undderground tanks.
                                                                                      t

Refer to
       o Figure 1 fo
                   or a plan off the propossed develop
                                                     pment.




                                       FIGU
                                          URE 1 - PR OPOSED REDEVELO
                                                            R      OPMENT


                                                                                                             SO
                                                                                                              OIL SUR
                                                                                                                    RVEYS
Log in to download the original file

1-22276-01 site plan.pdf · 5.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.