Council archive · source document
Appendix D Code Assessment · MCU16/0099.01
Specific Outcomes Probable solutions (if code assessment) Comments
setback a minimum of 30m from the top of the
bank of any watercourse and 10m from the top of
the bank of any drainage line.
O27 Active parklands will provide a diverse S27.1 Active parkland in all areas except O27 is not applicable
range of recreational opportunities for all age industrial areas will contain embellishment in No active parklands are proposed.
groups and are designed as attractive and accordance with the Priority Infrastructure Plan in
enjoyable, functional and safe places to recreate Part 15 such as:
and meet. children’s play facilities catering for various
ages;
a soft fall surface where required;
a shade cover over any play equipment;
picnic table/s with seats;
seating; and
landscaping;
AND
S27.2 Landscaping is designed to create
aesthetically pleasing open space areas and to
suit the type, setting and purpose of the particular
park.
O28 The natural environmental and cultural S28.1 Land in the Open Space Conservation O28 is not applicable
values of land in the Open Space Conservation Zone zone is retained in one contiguous lot. The proposal is not within the Open Space
are not adversely affected by subdivision, and land in Conservation Zone
freehold tenure in this zone is not subdivided.
O29 Lands with high biodiversity values which S29.1 Lands with high biodiversity values are O29 is not applicable
warrant conservation status are formally protected transferred to public ownership. The subject site and access lot do not contain
for the long term. areas with high biodiversity values.
O30 Buffers are provided incorporating S30.1 A buffer of no less than 5m is provided Partially complies with O30
development setback/s from the stream that will to all development adjacent to either Stream The proposed access and power installation to the
ensure that the development does not result in a orders 1, 2 or 3 where not within the Riparian approved facility will require minor earthworks
negative impact upon the long-term viability of the Buffer Area on the Biodiversity Overlay Maps within 5 m of a stream contained within the
stream. (with the buffer measured from the centreline of Riparian Buffer Area. However, the proposed
the stream).
Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 103
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix D Code Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.