Council archive · source document
Appendix D Code Assessment · MCU16/0099.01
Specific Outcomes Probable solutions (if code assessment) Comments
access only requires an all-weather gravel track to
allow for safe access for construction and
maintenance vehicles. The proposed power will
be installed underground via under boring and will
not negatively impact upon the long-term viability
of the stream.
Road and rail corridors
O31 Lots for residential development are not S31.1 Lots intended for residential O31 is not applicable
subjected to high traffic noise levels from the major development are separated by a minimum of— The Reconfiguring of a Lot is required for the
road network or rail corridors. 40m from the property boundary of roads proposed easement connecting to Jirrima Court. A
within the major road network; and new lot is not proposed.
80m from the property boundary of rail
corridors;
OR
S31.2 Development in the vicinity of road
corridors meets the following external design
criteria for roads in the major road network—
54dB(A)L10 (18hours) based on predicted
traffic volumes ten years hence;
OR
S31.3 Development in the vicinity of rail
corridors meets the following external design
level noise criteria—
65dB(a), assessed as the 24hour average
equivalent continuous A- weighted sound
pressure level; and
87dB(A), assessed as a single event
maximum sound pressure level.
Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 104
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix D Code Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.