Skip to the record
The only place to find full transcripts.

Council archive · source document

Appendix D Code Assessment · MCU16/0099.01

of 110

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Division 15 — Erosion and Sediment Control Code
Table 11 Specific outcomes for the erosion and sediment control code
                 Specific Outcomes                         Probable solutions (if code assessment)                                   Comments

 Effects of works
 Erosion and drainage control, sediment capture and      S1.2    Construction works are designed and           Complies with S1.1, S1.2, S1.3, S1.4 and S1.5
 stormwater runoff                                       managed to restrict the extent of clearing and        Construction of the proposed access track and
 O1     Development design, density, layout, and         soil exposure to that necessary for access, and       powerline installation for the approved facility will
 staging provide for erosion control, drainage control   safe construction;                                    involve minimal earthworks. Further, only minor
 and sediment capture and treatment during the                                                                 clearing and soil exposure will be required.
 construction phase.                                     AND                                                   Adequate sediment and erosion control, and
                                                                                                               stormwater management measures will be
                                                         S1.3     Clean stormwater is diverted or              implemented during construction.
                                                         managed around or through the site without
                                                         increasing the concentration of total suspended
                                                         solids or other contaminants in the flow and
                                                         without causing erosion (onsite or offsite);

                                                         AND

                                                         S1.4      Cleared areas are effectively stabilised
                                                         prior to rainfall if works are delayed or works are
                                                         not intended to occur immediately;

                                                         AND

                                                         S1.5     For buildings,
                                                                upstream runoff must be diverted around
                                                                the construction site; and
                                                                sediment barriers are provided downslope
                                                                of disturbed areas to prevent sediment
                                                                washing into gutters, drains and
                                                                watercourses either on or off the site; and




                                                                                          Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 49

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix D Code Assessment.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.