Appendix D Code Assessment · MCU16/0099.01
Specific Outcomes Probable solutions (if code assessment) Comments
exposed soil and construction access must
be managed in accordance with
International Erosion Control Association
Best Practice Erosion and Sediment
Control (BPESC) 2008; and
temporary or permanent downpipes are
connected to the stormwater system
before laying the roof; or
localised erosion is avoided by directing
flow from downpipes over non-erosive
areas.
O2 Works in a watercourse S2.1 Work within waterways must be O2 is not applicable
Construction activities within watercourses are undertaken in accordance with Best Practice The proposed access track will incorporate an
planned to prevent erosion, construction failure and Erosion and Sediment Control, Appendix I – existing waterway crossing that has been assessed
associated sedimentation. Instream works, Sections 14 and 16 as being efficiently able to support construction and
International Erosion Control Association 2008. maintenance vehicles to the approved facility. The
power will be installed beneath the waterway via
S2.2 Temporary vehicular crossings of under boring. No works are required within the
waterways must be designed and constructed to waterway.
convey flows for the 50%AEP event and remain
stable for all rainfall events up to 10%AEP
event.
Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 50
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix D Code Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.