Skip to the record
The gold standard in government transparency.

Council archive · source document

Appendix D Code Assessment · MCU16/0099.01

of 110

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                 Specific Outcomes                          Probable solutions (if code assessment)                                  Comments


                                                         AND

                                                         S1.6      Suitable methods are incorporated to
                                                         prevent the spread of invasive
                                                         environmental weed species at stormwater
                                                         outlets.
Water demand                                             S2.1      Captured water is plumbed to be              O2, O3 and O4 are not applicable
O2    Urban development reduces the need for             available for all external uses including gardening,   Urban development and backflow devices are not
mains water by capturing and utilising run-off from      irrigation, ponds and outdoor cleaning.                proposed.
appropriate areas on site.
                                                         S3.1   Planting is in accordance with PSP 3
O3     Urban development reduces the need for            Landscaping Plans and Guidelines.
mains water by eliminating requirement for irrigation
via the use the endemic plant landscaping design.        S4.1      A suitable backflow prevention device
                                                         is installed to protect the drinking water within
O4       Backflow devices or similar systems are         the reticulated water supply in accordance with
installed, where necessary, to ensure water reuse        AS/NZS 3500:2003 Plumbing and Drainage.
facilities have no impact on the quality of the town
mains water.
Shire Business Centre                                    No probable solution                                   O5 and O6 are not applicable
O5       Within the Shire Business Centre site, as                                                              The proposal is not within the Shire Business
shown on Map SBC run-off treatment is contained                                                                 Centre site.
within the developable areas of the site and drainage
lines are only used for final polishing of run-off;

AND

O6     Within the Shire Business Centre site, as
shown on Map SBC, on-site detention measures are
contained within the developable areas of the site,
clear of drainage lines and Open Space
Precincts.
Use of natural treatments and systems                    S7.1    No probable solution                           O7 is not applicable
O7     Natural treatment strategies, including grass                                                            The proposed access and power installation to
swales and bio-retention systems, vegetated filtration   S8.1    Integration of stormwater quality              the approved facility will not impact on water


                                                                                          Project 226420 File Appendix D – Code Assessment 2019-12-10 Revision 2 Page 87

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix D Code Assessment.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.