Original source · versioned page text
Service Level Catalogues
ACTIVITY SERVICE LEVEL TARGET
through to Council as a customer
request)
Council lights roads/pathways (Rate 20 days
3)
Parks lighting (includes lights in 10 days
shelters/bbq’s/decorative lighting etc.)
Operations
[Provision of glare shields or other modifications to existing light fittings, service charges and electricity consumption
costs as well as installation of festive lighting Christmas/New Year]
Cyclic activity Inspections Council lights (Rate 3) - 3 monthly 4
(by contractor)
Energy charges billing and analysis Quarterly
Scheduled Work Christmas Lighting installation
Hastings St/Noosa Dr – Christmas
tree (levy funded)
Cooran - Pioneer Park, King Street
Kin Kin - Lillypilly in Roundabout, Main
Street Annual all locations
Noosaville - Noosaville Lions Park (Dec install/Jan remove)
Peregian Beach - Norfolk Pine at
Heron & Kingfisher Street
Pomona - Fig Tree at Joe Bazzo Park
Tewantin – Extra lights in trees in
business area
Reactive work [customer Energex lights (Rates 1 & 2) 20 days
requests] investigations for glare
shields/luminaire changes; new light
on existing pole etc.
KEY SERVICE METRICS
Cost of service
Public Lighting 2018/19 2017/18 2016/17
Net cost 1,186,829 1,190,200 1,180,472
Rateable properties 30,500 30,000 30,000
Cost per rateable property 38.91 39.67 39.35
PERFORMANCE MEASURE
Service Indicator Performance Measure Methodology
Public Lighting Satisfaction Noosa community satisfaction Community satisfaction mean
mean rating score compared to performance rating from the LGAQ
the State mean rating score Community Satisfaction Tracking
(out of optimum rating of 5). Survey for Provincial areas for:
NSC mean State mean Theme: Basic Services &
rating (2019) rating (2017) Infrastructure
Function: Street Lighting
3.60 3.59
1 Rate 1 & 2 lights are owned and maintained by Energy Queensland (formerly Energex/Ergon). Rate 3 lights are
owned and maintained by Council and are an unmetered supply.
2 Hastings St Maintenance Levy covers lamp replacement and maintenance of street fairy lights.
3 Count of public streetlights as at April 2019
4 This is current LOS – Recurrent Maintenance Manual lists Coastal (every 2 months) and Rural (every 3 months).
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Service Level Catalogues(PDF, 3MB).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.