Original source · versioned page text
Service Level Catalogues
Service Listing 1 of 1
Service Output PUBLIC LIGHTING
Provision and maintenance of street and other lighting as a contribution
towards the safety of motorists and pedestrians.
Service Activity Maintenance & Operations
Rate 1 (non-contributed assets) & Rate 2 (contributed assets) – dealing
with requests for lights on existing poles and provision of glare shields
as well as service and energy consumption charges. Maintenance of Rate
3 (Council owned) and energy costs including decorative street lighting
and navigation lights at structures within man-made canals.
Responsible Area Department Branch
Infrastructure Services Civil & Asset Operations (Civil Works
& Maintenance)
Buildings & Facilities (Electrician)
Cost Centres Street Lighting (rate 1 & 2) 1 1512
Public Utility Management 2103
Christmas Lights (rate 3) 1521
Hastings Street Mtnce Levy 2 2022
Management Civil Operations 2000
Works Operations Coordination 2021
Works Operations 2704
Key Statistics Public lights total 5816 3
Council owned (Rate 3 only) 432 (also included in total above)
Christmas Lighting 6 installations
Street fairy lights Hastings St 23 trees/units approx.
Legislative responsibility to None. Australian Standards apply including:
provide this service • Australian Standard AS1742 Manual of Uniform Traffic Control Devices
(except where varied by Qld. MUTCD)
• Australian Standard AS1158 Lighting for Roads and Public Spaces
SERVICE DELIVERY MODEL
Internally managed with maintenance services provided by contractors or in-house electrician.
ACTIVITY SERVICE LEVEL TARGET
Maintenance
[Inspection and maintenance of Council owned Rate 3 Lighting and liaison with Energy Queensland on
maintenance and related issues for Rate 1 & 2 lighting]
Scheduled work Hastings Street - fairy lights lamp Every 5 years approx.
replacement (levy funded)
Note:
Poinciana Avenue – fairy lights (trees)
are owned and maintained by the
Business Association.
Council provided Christmas lighting Annual checks (replace as required)
maintenance (string/lamp
replacements)
Reactive work [customer Issue Target days for completion
requests] Energex lights (Rates 1 & 2) – lights 20 days
out (referred to Energex if they come
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Service Level Catalogues(PDF, 3MB).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.