Original source · versioned page text
Service Level Catalogues
ACTIVITY SERVICE LEVEL TARGET
• Enquiries / complaints No defined level of service – generally
• In relation to Free Holiday Bus etc. within 30 business days
KEY SERVICE METRICS
Measure Metric Benchmark Comparison
• Free Holiday Bus Program In development
- Percentage increase in patrons from previous years. 41% Xmas 2018/19
• Walk-and-Ride (Schools) Program Xmas 2019/2020:
- Percentage increase in patrons from previous years. 20% increase in
- Percentage change in parent car parking demand patronage compared to
previous year
• Road safety improvements:
- “Before” and “after” crash statistics, measured over Xmas 2020/21:
several years 20% decrease in
patronage compared to
• Road congestion / capacity measures: previous year. Therefore
- “Before” and “after” traffic counts, with on-going maintained 2018/19
monitoring over several years. levels
- “Before” and “after” Degrees of Saturation (DoS), with
acceptable levels during Non-Holiday and (Holiday)
periods: Under development in
o Stop/Give Way – DoS 0.70 (DoS 0.80) conjunction with
o Roundabout – DoS 0.70 (DoS 0.85) Transport Strategy
o Signalised Intersection – DoS 0.70 (DoS 0.90)
- Percentage of intersections exceeding acceptable Under development in
degrees of saturation conjunction with
Transport Strategy
Under development in
conjunction with
Transport Strategy
PERFORMANCE MEASURE
Service Indicator Performance Measure Methodology
Traffic Management Satisfaction Noosa community satisfaction Community satisfaction mean
4 mean rating score compared to performance rating from the LGAQ
the State mean rating score Community Satisfaction Tracking
(out of optimum rating of 5). Survey for Provincial areas for:
NSC mean State mean Theme: Basic Services & Infrastructure
rating (2019) rating (2017) Function: Traffic Management
3.40 3.45
1 Refer to Asset Responsibility Matrix for specific areas of responsibility
2 Maintenance and installation of Counters managed by Asset Management. Some permanent counters have not
operated properly since 2014 limiting data collection capabilities and these are in the process of being reviewed.
3 Currently no arrangements in place to recover costs associated with traffic engineering staff undertaking these
assessments on behalf of Property Branch. Arrangements need reviewing to ensure equitable.
4 Traffic Management covers a broad area within Noosa Council, from general customer requests to road safety
investigations, to heavy vehicle permits, to travel behavior change programs – there can be significant variation in
satisfaction levels. As an example, a customer requests for infrastructure may be unsupported if it is dangerous or
unsuitable for the wider community, yet this decision may result in a dissatisfied customer. Whilst there are few other
measurements that can be used, caution should be used when analyzing satisfaction levels as a measure of
performance of traffic management issues.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Service Level Catalogues(PDF, 3MB).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.