Skip to the record
Accept no imitations.

Original source · versioned page text

Approved Document Bushfire Hazard and Mitigation Plan 25 02 2025 MCU21/0110 - Negotiated

of 39
                                                                                                                                                      22



         Performance outcomes                                Acceptable outcomes                                             Response
PO4                                                AO4.1                                                R4.1
Essential community infrastructure is able to      Development involving essential community        There are no Community Uses and
function effectively during and immediately        infrastructure is not located within a medium or Infrastructure Uses associated with the
after bushfire events.                             high bushfire hazard area.                       proposed development and therefore not
                                                   OR                                               located in Bushfire Hazard Area.

                                                   AO4.2
                                                   Where located in a medium or high bushfire
                                                   hazard area, development involving essential
                                                   community infrastructure is designed to
                                                   function effectively during and after a bushfire
                                                   event in accordance with a Bushfire Hazard
                                                   Management Plan.
                                                   Editor’s Note— PSP8 Natural Hazards provides
                                                   guidance for assessing bushfire hazard risk and
                                                   preparing a bushfire hazard management plan.
Hazardous Materials
PO5                                                AO5                                                  R5
Public safety and the environment are not          Hazardous materials are not manufactured or The proposed development will not involve the
adversely affected by the impacts of bushfire      stored in bulk in a bushfire hazard area.   manufacture or storage of large quantities of
on hazardous materials manufacturing or                                                        hazardous materials.
storing in bulk.




Access and Evacuation Routes



                                  RF17-040 – Boutique Hotel – Noosa Springs – Bushfire Hazard Assessment & Management Plan
Rob Friend & Associates Pty Ltd                                                                                                     25th of February 2025

Log in to download the original (Approved Document Bushfire Hazard and Mitigation Plan 25 02 2025 MCU21_0110 - Negotiated.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.