2307-35698 SER_Amended response - with conditions
Attached to the e-mail 2307-35698 SER application correspondence - Changed early referral response—with conditions OPW23/0116.
2307-35698 SER
Attachment 1—Changed conditions to be imposed
No. Conditions Condition timing
Development Permit for operational work
Schedule 10, Part 17, Division 3, Table 1, Item 1 – Tidal works or work within a coastal management
district —The chief executive administering the Planning Act 2016 nominates the Director-General of
the Department of Environment and Science to be the enforcement authority for the development to
which this development approval relates for the administration and enforcement of any matter relating
to the following conditions:
1. The development must be carried out generally in accordance with For the duration of
the following plan (as amended in red): works and to be
maintained
Proposed replacement pontoon and gangway, prepared by Superior
Jetties, dated 07/08/2023, drawing number 20209-D01, version A
2. The works to which this approval relates are to be for a private At all times
purpose only.
3. Any operator and contractor involved in the works to which this During construction
approval relates must:
(a) be provided a copy of referral agency conditions
(b) install all measures, plant and equipment necessary to
ensure compliance with the conditions of this approval
(c) maintain such measures, plant and equipment in a proper
and efficient condition
(d) operate such measures, plant and equipment in a proper
and efficient manner
4. For the proposed works only use material which are free from During construction
contaminants as defined under section 11 of the Environmental
Protection Act 1994.
5. Should the works become damaged as a result of erosion, flooding At all times
or storm tide inundation, the registered landowner(s) of the subject
land shall be responsible for the removal of all debris at their own
expense.
Schedule 10, Part 17, Division 3, Table 2, Item 1 – Tidal works or work within a coastal management
district —The chief executive administering the Planning Act 2016 nominates the Director-General of
the Department of Transport and Main Roads to be the enforcement authority for the development to
which this development approval relates for the administration and enforcement of any matter relating
to the following conditions:
6. The development must be carried out generally in accordance with At all times
the following plan (as amended in red):
Proposed replacement pontoon and gangway, prepared by Superior
Jetties, dated 07/08/2023, drawing number 20209-D01, version A
7. (a) Light/mark all vessels, structure, plant and equipment associated For the duration of
with the works, in accordance with Section 3 of AS4282-1997 works and for operation
Control of the obtrusive effects of outdoor lighting. to be maintained at all
times
Lighting provided must not obscure, disguise or otherwise interfere
with the safe navigation of other vessels, including the effectiveness
of navigational lighting.
State Assessment and Referral Agency Page 3 of 5