Attached to the e-mail 2307-35698 SER application correspondence - Changed early referral response—with conditions OPW23/0116.
2307-35698 SER
8. The construction, operation and maintenance of the pontoon. And For the duration of
any ship berthed, moored or attached to the structure, must not: works, and at all times
(a) encroach into, pass over or under a navigation corridor or
(b) be located in a high risk maritime zone; or
impede the safe navigation of other ships or boats; or restrict safe
access to or from neighbouring structures
9. Remove and dispose of any debris or similar obstruction For the duration of
encountered whilst undertaking the work at an appropriately licensed works
facility.
10. All piles and/or structure to be demolished, both above and below Prior to the completion
the waterline must be completely extracted/removed. of the works
State Assessment and Referral Agency Page 4 of 5