Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

2307-35698 SER_Amended response - with conditions

Attached to the e-mail 2307-35698 SER application correspondence - Changed early referral response—with conditions OPW23/0116.

of 5

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                              2307-35698 SER



Attachment 2—Reasons for decision to impose conditions

The reasons for this decision are:
    The proposed development is for operational work for prescribed tidal works to construct a
       pontoon at 47 Mossman Court, Noosa Heads, which is formally described as Lot 88 on N2184.
    The pontoon and gangway is for private use and for one vessel with a maximum wet vessel
       beam of 4 metres.
    The proposed structure, including any vessel berthed, moored or attached to the structure:
           o will not encroach into, pass over or under a navigation corridor, and
           o is not located in a high-risk maritime development zone.
    The proposed structure meets the FT5 qualifying criteria checklist 4 and complies with the SDAP,
       subject to conditions to ensure:
           o the development is carried out generally in accordance with the plans of development
                submitted with the application
           o that at all times, all lights on or above the development site do not interfere with safe
                navigation in surrounding waterways
           o the development does not encroach on the navigation corridor or high-risk maritime zone
                to ensure the safe passage of vessels
           o that debris from the development does not create a hazard to navigation
           o that there is no residual material that could create a hazard to navigation.
    The proposed structure meets the FT5 qualifying criteria checklist 5 and complies with the SDAP,
       subject to conditions to ensure:
           o the development is carried out generally in accordance with the plan of development
                submitted with the application.
           o that at all times, the works, to which this approval relates are for private purpose only.
           o any operator and contractor involved in the works ensures impacts on coastal values
                (water quality) are avoided or minimised.
           o works only use materials which are free from contaminants as defined under section 11
                of the Environmental Protection Act 1994.
           o damaged works as a result of erosion, flooding or storm tide inundation, the registered
                landowner(s) of the subject land shall be responsible for the removal of all debris at their
                own expense.

Materials used in the assessment of the early referral response:
    The development application material and submitted plans
    Planning Act 2016
    Planning Regulation 2017
    State Development Assessment Provisions (version 3.0), as published by SARA
    The Development Assessment Rules




 State Assessment and Referral Agency                                                            Page 5 of 5
Log in to download the original file

2307-35698 SER_Amended response - with conditions.pdf · 244 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.