Attachment 6 - Stormwater Management Plan
The original of this document is very large (26.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnR2015: NOOSA LANDFILL - STORMWATER MANAGEMENT PLAN
Figure 5 – Masterplan Years 6-10 (Source: ATC Williams)
Works for Years 1 to 5 include:
+ Ongoing Cell 2.2 operations
+ Cell 1.1 Expansion
+ Southern Clean Water Drain
+ SW5 HES basin
+ Cell 1.1 Batter Capping Works
+ Construction of Cell 3.2 & 3.3 (detailed as Cell 2.3 in Figure 4)
+ Construction of Cell 3.4 (detailed as Cell 2.4 in Figure 4)
+ Filling of Redevelopment Area for Green waste and Concrete Crushing
This report has been prepared for the works to be undertaken in Years 1 to 5. Although works to be undertaken between
Years 6 to 10 have been investigated in determination of control measures, it is recommended a revision to this document
be undertaken prior to these works.
Environment. Engineering. Education. PAGE 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.