Log in to see the plans as drawnR2015: NOOSA LANDFILL - STORMWATER MANAGEMENT PLAN
2.3. CLIMATE
The Bureau of Meteorology (BOM) provides average annual rainfall data for the Eumundi-Crescent Road, Gauging
Station 040157. Based on this data, the average annual rainfall is 1,677 mm. Rainfall has a distinctly seasonal pattern,
with the majority of fall occurring between December and May. The average annual rainfall records are illustrated in
Figure 3.
Figure 3 –Average Annual Rainfall for Eumundi Crescent Road
2.4. MASTERPLAN
A masterplan has been prepared by ATC Williams for the Noosa landfill. Works are detailed for Years 1-5 and Years 6-10
in Figures 4 and 5.
Figure 4 – Masterplan Years 1-5 (Source: ATC Williams)
Environment. Engineering. Education. PAGE 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.