Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

Attachment 6 - Stormwater Management Plan

of 63

Page text shows just the words. Original shows the document exactly as it was published.

Very large file: it may take a few minutes

The original of this document is very large (26.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
R2015: NOOSA LANDFILL - STORMWATER MANAGEMENT PLAN



Due to the constraints around the flood levels and outlets, it is not recommended to augment the existing basin w hich
has a piped outlet and spillway below the Q2 flood level.

A concept of this approach is provided in Appendix A, Drawing Concept-06 for the ultimate catchment. The approach
would also require filling of the northern portion of the pad to grade back to the basin inflow.

       2.     Construct New HES Basin

Based on discussions with NSC, the preferred location for a new basin would be in the north-western corner of the pad,
being where the proposed filling is to occur. Two options for the direction of the basin are provided in Appendix A,
Drawing Concept-06 and Concept-07.

There are two main options in regards to levels for the HES basin:

       +      Design the piped outlet and spillway above nominated flood level (e.g. Q10)
       +      Design the spillway only above nominated flood level (e.g. Q10), with the piped outlet below flood levels and to
              include a frog flap to prevent backflows

Based on Figure 8, the ideal outlet location is along the northern boundary to prevent choked flows in the drainage
channel and existing high point to the west. An outlet along the northern boundary could be approximately RL 11.75.
The flood levels in this vicinity are approximately RL 12.50 (Q10).

Early discussions indicated the preference to locate the basin on the north-eastern corner of the pad. As the outlet
location here is approximately 2m higher than the proposed outlet, this location would require an additional 2m of fill
on the pad to achieve an outlet from the basin. As the pad level is governed by the outlet level and not the Minimum
Floor Levels, it is recommended that the lowest achievable outlet location be adopted to reduce fill requirements. Due
to the sensitivity of the outlet level, additional detailed survey is recommended along the northern boundary in the outlet
location.




Figure 8 – Northern Outflows (Proposed HES Basin)




Environment. Engineering. Education.                                                                                   PAGE 11
Log in to download the original file

Attachment 6 - Stormwater Management Plan.pdf · 26.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.