Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

Attachment 6 - Stormwater Management Plan

of 63

Page text shows just the words. Original shows the document exactly as it was published.

Very large file: it may take a few minutes

The original of this document is very large (26.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                                                                                                                                                                                               LEGEND

                                                                                                                                                                                                                                                                                                       EXISTING CONTOURS (0.5m)


                                                                                                                                                                                                                                                                                                       CATCHMENT TO BASIN
                                                                                                      EXISTING BIO BASIN
                                                                                                                                                                                                                                                                                                       CATCHMENT TO BIO


                                                                                                                                                                                                                                                                                       1               CATCHMENT LABEL


                                                                                                                                                                                                                                                                                                       FLOW DIRECTION

                                                                                                                                                                                                                                                                                                       EXISTING FLOWPATH

                                                                                                                                                                                                                                                                                                       CLEAN WATER DRAIN

FLOOD LEVELS PROVIDED BY NSC:
Q1 - 12.76                                                                                                                                                                                                                                                                                             DIRTY WATER DRAIN
                                                                       EXISTING HES BASIN                                          CATCHMENT TO BIO - 1.8 HA
Q2 - 12.79
Q10 - 12.92                                                                                                                                                                                                                                                                                            PROPERTY BOUNDARY
Q100 - 13.07
Q100 CC - 13.16                                                                                                                                                                                                                                                                                        ACTIVE AREA

                                                                                                                                                                                                                                                                                                       AREA TO BE STABILISED
  PIPED OUTLET RL 11.30
  EMERGENCY SPILLWAY RL 12.20                                                                                    INFLOW RL 12.50



                                                                       CATCHMENT TO BASIN - 3.9 HA

                                                                       BASIN DEISGNED FOR 3.6 HA
                                                                                                                                                                                                                                           ACCESS TRACK DRAINAGE
                                                                                                                                                                                                                                           AND SMALL SECTION OF CELL
                                                                                                                                                                                                                                           2.2 DIRECTED TO HES BASIN




                                                                                                                            PIPE TO BE BLOCKED AS PER O2 SMP




                                                                                                                                                                                                                                                                           AREA TO BE STABILISED




                                                                                                                                                                                                                       CLIENT                                                PROJECT
                                   D       CELL NUMBER REVISION                                      KR          20/09/21              0                    40                               COPYRIGHT C                               NOOSA SHIRE COUNCIL                    NOOSA LANDFILL STORMWATER MANAGEMENT PLAN
                                   C       FINAL DESIGN REPORT                                       KR          03/06/21                                                                TOPO GROUP PTY LTD
                                                                                                                                                                                                                       DRAWN                   DESIGNED      DATE            DRAWING TITLE
                                   B       NEW ATC DESIGN                                            KR          12/04/21
                                                                                                                                             SCALE 1:2000                         THIS DOCUMENT MAY NOT BE COPIED OR            KR                      KR      31/03/21                      STORMWATER MANAGEMENT - NORTH
                                                                                                                                                                 ISSUED FOR USE   TRANSMITTED IN ANY FORM OR BY ANY
                                   E       REVISION TO NORTH OPTIONS                                 KR          10/12/21                                                         MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                                                                                       RPEQ / SIGNATURE (IF REQUIRED)                                               CURRENT APPROACH
                                                                                                                                     NORTH
                                                                                                                                                            A3                    THE WRITTEN CONSENT OF TOPO GROUP                CPESC - 5395, RPEQ - 15954                PROJECT No                     DRAWING No            REVISION
                                REVISION   DESCRIPTION                                        APPROVED BY         DATE                                                                          PTY LTD.                                                                                     20-0211              CONCEPT-09           E
Log in to download the original file

Attachment 6 - Stormwater Management Plan.pdf · 26.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.