Skip to the record
The only place to find full transcripts.

Original source · versioned page text

Attachment 6 - Stormwater Management Plan

of 63

Page text shows just the words. Original shows the document exactly as it was published.

Very large file: it may take a few minutes

The original of this document is very large (26.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                                                                                                                                           LEGEND

                                                                                                                                                                                                                                                   EXISTING CONTOURS (0.5m)


                                                                                                                                                                                                                                                   CATCHMENT TO BASIN


                                                                                                                                                                                                                                                   CATCHMENT TO BIO

                                                                                          CATCHMENT - 5.6 HA                                                                                                                       1               CATCHMENT LABEL


                                                                                                                                                                                                                                                   FLOW DIRECTION

                                                                                                                                                                                                                                                   EXISTING FLOWPATH

                                                                                                                                                                                                                                                   CLEAN WATER DRAIN


                                                                                                                                               REDIRECT DRAIN TO                                                                                   DIRTY WATER DRAIN
                                                                                                                                               DISCHARGE AT SW4 ONCE
                                                                                                                                               CATCHMENT IS STABILISED                                                                             PROPERTY BOUNDARY


                                                     REFER TO D12A,D12B,D12C & D13                                                                                                                                                                 ACTIVE AREA
                                                     FOR PAD WATER QUALITY OPTIONS
                                                                                                                                                                                                                                                   AREA TO BE STABILISED




                                                                                                                                                                     CELL 2.4 NOT UNDER
                                                                                                                                                                     CONSTRUCTION




                                                                     PIPE TO BE BLOCKED AS PER O2 SMP




                                                                                                                                                                     CLIENT                                              PROJECT
   D       CELL NUMBER REVISION            KR             20/09/21           0                    40                                       COPYRIGHT C                               NOOSA SHIRE COUNCIL                  NOOSA LANDFILL STORMWATER MANAGEMENT PLAN
   C       FINAL DESIGN REPORT             KR             03/06/21                                                                     TOPO GROUP PTY LTD
                                                                                                                                                                     DRAWN                   DESIGNED      DATE          DRAWING TITLE
   B       NEW ATC DESIGN                  KR            12/04/21
                                                                                   SCALE 1:2000                                 THIS DOCUMENT MAY NOT BE COPIED OR            KR                      KR      31/03/21                    STORMWATER MANAGEMENT - NORTH
                                                                                                               ISSUED FOR USE   TRANSMITTED IN ANY FORM OR BY ANY
   E       REVISION TO NORTH OPTIONS       KR            10/12/21                                                               MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                                     RPEQ / SIGNATURE (IF REQUIRED)                                                  STAGE 1
                                                                           NORTH
                                                                                                  A3                            THE WRITTEN CONSENT OF TOPO GROUP                CPESC - 5395, RPEQ - 15954              PROJECT No                     DRAWING No            REVISION
REVISION   DESCRIPTION                 APPROVED BY        DATE                                                                                PTY LTD.                                                                                   20-0211              CONCEPT-10           E
Log in to download the original file

Attachment 6 - Stormwater Management Plan.pdf · 26.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.