Log in to see the plans as drawnR2015: NOOSA LANDFILL - STORMWATER MANAGEMENT PLAN
1.4. LICENSE CONDITIONS AND WATER QUALITY OBJECTIVES
The following conditions specified by the site permit (Permit No. BRID0056) relate, directly or indirectly, to the
management of stormwater:
WT1 – Site erosion protection measures and sediment control measures must be implemented and must have the
hydraulic effectiveness to treat stormwater for 90% of the annual runoff for each stormwater catchment.
Where soils are temporarily exposed for the construction of new facilities or to facilitate changes in landfill design, all
reasonable and practical measures must be implemented to minimise the amount of sediments able to discharge from
the site. As a minimum the following design criteria apply:
1. Collect and drain stormwater from disturbed soils to a sediment basin sized to contain an 80 th% five-day event
or similar; and
2. The design life and design storm for temporary drainage works to convey waters to the sediment basin and
around disturbed areas are:
a. Disturbed area open < 12 months – 1 in 2-year ARI event plus 150mm freeboard
b. Disturbed area open 12-24 months – 1 in 5-year ARI event plus 150mm freeboard
c. Disturbed area open > 24 months – 1 in 10-year ARI event plus 150mm freeboard
d. Temporary culvert crossing – minimum 1 in 1-year ARI hydraulic capacity
WT2 - The release of collected and treated stormwater to waters, from areas of the site not likely to be contaminated
with waste materials, must be in accordance with Table 2 – compliance limits for controlled releases of treated stormwater
to surface waters
Note: Table 2 is reproduced below as Table 1.
Table 1 – Surface Water Release Limits
QUALITY
RELEASE POINT RELEASE LIMIT LIMIT TYPE MONITORING FREQUENCY
CHARACTERISTICS
pH 6.5 - 9.0 Range
Specific Conductance
1500 Maximum Commencement of Release then weekly
(µS/cm)
thereafter. If no release occurs, no
Dissolved Oxygen (mg/L) 6 Minimum sampling is required.
Total and Dissolved
N/A Maximum
Aluminium (mg/L)
Commencement of Release then weekly
W1 thereafter for a minimum of 5 events
and until a reliable TSS:NTU correlation
Suspended Solids (mg/L) 50
is established and agreed in writing by
the administering authority. If no release
occurs, no sampling is required.
The established The NTU value
correlation of that correlates to Commencement of Release then weekly
Turbidity (NTU) turbidity with total 50mg/L TSS with thereafter. If no release occurs, no
suspended solids a correlation R sampling is required.
(TSS) value of 0.9
WT3- Monitoring of contaminant releases from release point W1 must be undertaken in accordance with the condition
WT2.
WT4 - In addition to WT2, released to waters must not:
1. have any other properties and content concentration causing environmental harm
2. produce any slick or other visible evidence of oil or grease, nor contain visible floating oil, grease, scum, litter or
other visually objectionable matter.
Environment. Engineering. Education. PAGE 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.