Attachment 6 - Stormwater Management Plan

of 63

Page text shows just the words. Original shows the document exactly as it was published.

Very large file: it may take a few minutes

The original of this document is very large (26.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                                                                                                                                                                                  LEGEND

                                                                                                                                                                                                                                                                                          EXISTING CONTOURS (0.5m)


                                                                                                                                                                                                                                                                                          WORKS AREA


                                                                                                                                                                                                                                                                                          FLOW DIRECTION

                                                                                                                                                                                                                                                                                          EXISTING FLOWPATH

                                                                                                                                                                                                                                                                                          EXISTING FLOWPATH TO DAMS


                                                                                                                                                                                                                                                                                          FILL BUND


                                                                                                                                                                                                                                                                                          SEDIMENT FENCE




                                              GRADE FILL INTO EXISTING DRAIN - INSTALL                                                                                                                                                          EXISTING DAM COULD BE UTILISED FOR BATCH TREATMENT OF
                                              SEDIMENT CONTROL OR INCORPORATE INTO                                                                                                                                                              CAPTURED WORK ZONES (RUNOFF PUMPED TO DAM). NSC IS TO
                                              CAPPING WORKS SEDIMENT BASINS / CONTROLS                                                                                                                                                          BE NOTIFIED IF DAM IS TO BE UTILISED WITH AGREEMENT ON
                                                                                                                                                                                                                                                POST CONSTRUCTION RECTIFICATION TO BE UNDERTAKEN




                                                                                                                                                                                                  PLACE SEDIMENT FENCE AT TOE OF FILL. PROGRESSIVELY
                                                                                                                                                                                                  STABILISE FILL AND GRADE FILL BACK TO SOUTH TO HOLD IN
                                                                                                                                                                                                  CLEAN WATER DRAIN/ BEHIND PERIMETER ROAD FILL
PERIMETER ROAD ALL IN FILL. AS FILL IS RAISED - DIRECT
ALL RUNOFF INTO CELL EXPANSION WORKS TO BE
CAPTURED. SOUTHERN SIDE OF FILL TO BE                                           FILL CAN BE DIRECTED TO CELL EXPANSION CAPTURE OR
PROGRESSIVELY STABILISED WITH SOIL BINDER AS RAISED                             TO CLEAN WATER DRAIN HOLDING AREA DEPENDING ON
                                                                                WHICH WORKS ARE BEING UNDERTAKEN CONCURRENTLY




                                                                                                                                                                                                          CLIENT                                                PROJECT
                                                                                                                          0                    40                                                                         NOOSA SHIRE COUNCIL
                                                                                                                                                                                COPYRIGHT C                                                                                         NOOSA LANDFILL EXPANSION
                                                                                                                                                                            TOPO GROUP PTY LTD
                                                                                                                                                                                                          DRAWN                   DESIGNED       DATE           DRAWING TITLE
         B       REVISION FOLLOWING NSC COMMENTS                                             KR        16/09/21
                                                                                                                                SCALE 1:2000                         THIS DOCUMENT MAY NOT BE COPIED OR            KR                      KR       14/09/21              CONCEPT EROSION AND SEDIMENT CONTROL
                                                                                                                                                    ISSUED FOR USE   TRANSMITTED IN ANY FORM OR BY ANY
         A       ORIGINAL ISSUE                                                              KR        14/09/21                                                      MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                                                                          RPEQ / SIGNATURE (IF REQUIRED)                                            PERIMETER ROAD
                                                                                                                        NORTH
                                                                                                                                               A3                    THE WRITTEN CONSENT OF TOPO GROUP                CPESC - 5395, RPEQ - 15954                PROJECT No                     DRAWING No            REVISION
      REVISION    DESCRIPTION                                                            APPROVED BY   DATE                                                                        PTY LTD.                                                                                     20-0211                CESCP-03           B
Log in to download the original file

Attachment 6 - Stormwater Management Plan.pdf · 26.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.