Original source · versioned page text
Attachment 6 - Stormwater Management Plan
The original of this document is very large (26.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn LEGEND
EXISTING CONTOURS (0.5m)
WORKS AREA
FLOW DIRECTION
EXISTING FLOWPATH
EXISTING FLOWPATH TO DAMS
BUND
EXISTING DAM COULD BE UTILISED FOR BATCH TREATMENT OF
CAPTURED WORK ZONES (RUNOFF PUMPED TO DAM). NSC IS TO
BE NOTIFIED IF DAM IS TO BE UTILISED WITH AGREEMENT ON
POST CONSTRUCTION RECTIFICATION TO BE UNDERTAKEN
AS WORKS PROGRESS TO NORTH WHERE BUNDING WILL
NOT CAPTURE RUNOFF, RAPIDLY UNDERTAKE WORKS AND
TURF PRIOR TO RAINFALL. IF TURF CANNOT BE PLACED,
APPLY TEMPORARY MATTING (JUTE) OR APPLY SOIL BINDER
PROVIDE BUND DURING EARLY WORKS AT
WESTERN END AS REQUIRED TO ENSURE
NO RUNOFF CAN LEAVE WORKS AREA
ENSURE END OF CURRENT WORKS IS BUNDED (CAN LEAVE
SECTION HIGH WITH ALL EXCAVATION UPSLOPE). THIS WILL ALLOW
ALL RUNOFF FROM CLEAN WATER DRAIN TO BE CAPTURED.
CAPTURED WATER IN WORKED ZONE TO BE TREATED AND
CONSTRUCT BUND IN GULLY IF PERIMETER DEWATERED IN-SITU OR AS AGREED WITH SUPERINTENDENT
ROAD IS NOT UNDERTAKEN CONCURRENTLY
ADDITIONAL BUNDS MAY BE REQUIRED IN
NOT PRACTICAL TO DIVERT UPSLOPE SECTIONS TO RETAIN ALL RUNOFF
EXTERNAL RUNOFF AROUND WORKS
CLIENT PROJECT
0 40 NOOSA SHIRE COUNCIL
COPYRIGHT C NOOSA LANDFILL EXPANSION
TOPO GROUP PTY LTD
DRAWN DESIGNED DATE DRAWING TITLE
B REVISION FOLLOWING NSC COMMENTS KR 16/09/21
SCALE 1:2000 THIS DOCUMENT MAY NOT BE COPIED OR KR KR 14/09/21 CONCEPT EROSION AND SEDIMENT CONTROL
ISSUED FOR USE TRANSMITTED IN ANY FORM OR BY ANY
A ORIGINAL ISSUE KR 14/09/21 MEANS IN PART OR IN WHOLE WITHOUT
RPEQ / SIGNATURE (IF REQUIRED) CLEAN WATER DRAIN
NORTH
A3 THE WRITTEN CONSENT OF TOPO GROUP CPESC - 5395, RPEQ - 15954 PROJECT No DRAWING No REVISION
REVISION DESCRIPTION APPROVED BY DATE PTY LTD. 20-0211 CESCP-04 B
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.