Skip to the record
Beware of cheap imitations.

Original source · versioned page text

Attachment 6 - Stormwater Management Plan

of 63

Page text shows just the words. Original shows the document exactly as it was published.

Very large file: it may take a few minutes

The original of this document is very large (26.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
R2015: NOOSA LANDFILL - STORMWATER MANAGEMENT PLAN



2                SITE DESCRIPTION
2.1.                LOCATION AND OPERATIONS

The Noosa Landfill is located on Eumundi-Noosa Road, Doonan and undertakes a range of waste processing and
resource recovery operations over the site. A portion of the site is finished landfill and has a vegetated surface. Activities
across the site include:

       +      waste collection,
       +      resource recovery,
       +      concrete crushing/recycling,
       +      green waste recovery and processing, and
       +      oil and paint collection.

The site activities and disturbed areas, as of the 13th November 2021 are illustrated in Figure 2.




                                                              Bio Basin


                                                                          Green Waste
                       Site Entry                                          Processing
                                                  HES Basin

                                       Resource
                                       Recovery            Concrete
                                                          Processing
                          Weighbridge




                                                                                         Cell 2.2 -
                                                                                        operational




Figure 2 – Aerial Photography and Disturbed Areas (Source: NearMaps, image date 13-11-21)

2.2.                TOPOGRAPHY

The topography varies considerably across the site due to historic landfilling operations. The peak elevations across the
site occur in the central portion of the site (Cell 1.1). All runoff from site is directed to the northern and north-eastern
boundary to discharge points SW2, SW4 and SW5. Details on the existing catchments and flowpaths are provided in
Appendix A with further details provided in Section 3.




Environment. Engineering. Education.                                                                                  PAGE 6
Log in to download the original file

Attachment 6 - Stormwater Management Plan.pdf · 26.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.