001 ECM_22372723_v3_Decision Notice - Minor Change - MCU21 0231 01 · MCU21/0231.02
21. All landscape works must be established and maintained in accordance with the approved
design for the life of the development, and in a manner that ensures healthy, sustained and
vigorous plant growth. All plant material must be allowed to grow to full form and be
refurbished when its life expectancy is reached.
22. All landscape works must be maintained generally in accordance with the approved design
for the life of the development.
Treatment of Temporarily Vacant Land
23. Where some or all of the land remains vacant or undeveloped for more than 3 months, or
buildings are demolished and redevelopment is delayed for more than 3 months, the
following works must be carried out:
a. the site must be cleared of all rubble, debris and demolition materials
b. erosion and sediment control devices installed
c. the site must be graded to prevent ponding (to the same level as the adjoining footpath
wherever practicable)
d. the site must be maintained to ensure no nuisance to adjacent premises, roads or
footpaths
Community Management Statement
24. Any proposed Community Management Statement required for the development pursuant to
the Body Corporate and Community Management Act 1997 must be submitted to Council for
endorsement at the same time as submission of the Building Format Plan (or similar) to
Council for compliance assessment.
External Works
25. Natasha Avenue and Katharina Street must be upgraded for the length of its frontages to the
subject site. The works must be undertaken generally in accordance with TOD Consulting’s
plan 21617-SK200, Rev B “Preliminary Design – General Arrangement” and in accordance
with an Operational Works approval and must include in particular:
a. construction of kerb and channelling and underground stormwater drainage to the
development side only;
b. construction of a pedestrian footpath in accordance with the conditions of this Decision
Notice;
c. removal of the existing properties’ accesses and reinstatement of the kerb, footpath
and verge area to match the balance of the site frontage, including the provision of
topsoil and turf where the existing verge is grassed.
Site Access and Driveways
26. Two sealed access driveways must be provided from Natasha Avenue and Katharina Street
to all parking and manoeuvring areas of the development. The works must be undertaken
generally in accordance with TOD Consulting’s plan 21617-SK200, Rev B “Preliminary
Design – General Arrangement” and in accordance with an Operational Works approval and
must include in particular:
a. driveway crossover in accordance with council standard drawings RS-049, RS-050 and
respective addendums.
Car Parking
27. A minimum of 17 car parking spaces must be provided and marked on the site. The works
must be undertaken in accordance with an Operational Works approval and must include in
particular:
a. one (1) visitor parking spaces within the total, which are clearly marked for that purpose
and accessible at all times for visitor use;
Page 5 of 10
Document Set ID: 22372723
Version: 3, Version Date: 13/04/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001 ECM_22372723_v3_Decision Notice - Minor Change - MCU21 0231 01.pdfRelated documentApplication case desk ↗