b. dimensions, crossfalls and gradients in accordance with Australian Standard AS2890:
Parking Facilities.
Pedestrian and Bicycle Facilities
28. Pedestrian and bicycle facilities must be provided for the development. The works must be
undertaken generally in accordance with TOD Consulting’s plan 21617-SK200, Rev B
“Preliminary Design – General Arrangement” and in accordance with an Operational Works
approval and must include in particular:
a. a 1.5 metre wide concrete footpath within the road verge for the entire length of the
site’s frontage to Natasha Avenue, alignment to be determined at operational works
stage, with consideration given to the existing native trees in the road reserve;
b. a 1.5 metre wide concrete footpath within the road verge for the entire length of
the site’s frontage to Katharina Street.
Stormwater Drainage
29. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken generally in accordance with TOD Consulting’s
plan 21617-SK200, Rev B “Preliminary Design – General Arrangement” and in accordance
with an Operational Works approval.
Services
30. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
31. Certification must be submitted to Council from all relevant service providers (Energex, NBN
and Unitywater) which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Easements
32. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
33. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
34. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
35. All excavation, fill and associated batters must be undertaken generally in accordance with
TOD Consulting’s plan 21617-SK100, Rev B “Preliminary Design – Earthworks” and in
accordance with an Operational Works approval, and contained entirely within the subject
site unless written permission from the respective landowner(s) is provided to Council.
36. All retaining walls must be designed and constructed in accordance with the planning scheme
and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
safety fence.
Damage to Services and Assets
37. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
Page 6 of 10
Document Set ID: 22372723
Version: 3, Version Date: 13/04/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001 ECM_22372723_v3_Decision Notice - Minor Change - MCU21 0231 01.pdfRelated documentApplication case desk ↗
SUPERSEDED - Decision Notice - Minor Change - MCU21 0231 01 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 174 KB (small file)
- File type
No other editions are linked here.