PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 26 MAY 2015
De-commissioning UPSS
94. UPSS may be temporarily decommissioned for a period of up to 2 years. During this
time the tank must be filled with water mixed with a water-miscible corrosion inhibitor
(as per manufacturer’s instructions), or made safe by other approved methods in
accordance with the relevant Australian Standards and Workplace Health and Safety
Qld.
95. Council must be notified when any tank is temporarily decommissioned. Before the
tank can be reused that system must undergo equipment integrity testing to ensure
tightness and certification submitted to council.
96. Where more than 2 years elapses since a tank were decommissioned, the UPSS
must be permanently removed in accordance with the relevant Australian Standards
and Workplace Health and Safety Qld.
97. Certification must be provided to Council confirming the UPSS de-commissioning
was conducted by a suitably qualified and experienced person, and that removal,
transportation and disposal was in accordance with the Standards and legislation.
98. At the time of abandonment of any UPSS the site must be investigated for
contamination. An assessment report must be prepared by a suitably qualified and
experienced person to verify the site has either met remediation criteria or is suitable
for continued and future use. The assessment report must be submitted to council no
later than 60 days of either the:
a. decommissioning of an UPSS if no soil or ground water remediation is required
b. completion of any remediation associated with the decommissioning of an
UPSS if remediation is required.
99. All records associated with the decommissioning of UPSS must be maintained for a
period of 7 years after removal of the UPSS. These records must be provided to
future owners/operators of the service station and property, as part of ensuring all
practicable measures have been implemented to prevent site contamination.
Air
100. The release of noxious or offensive odours or other airborne contaminants, including
particles, smoke, fumes and aerosols resulting from the service station, must not
cause environmental harm to any occupier of the property or beyond the boundary of
the property.
Noise
101. The emission of noise from the service station operation must not exceed the levels
specified in Table 1.
TABLE 1
NOISE LIMITS AT A SENSITIVE RECEPTOR
Noise level at noise sensitive place measured as the adjusted
PERIOD
maximum sound pressure level (LAmax, adj,T)
7am – 6pm Background noise level (LAbg,T) plus 5 dB(A)
6pm – 10pm Background noise level plus 5 dB(A)
10pm – 7am Inaudible
Page 17 of 171
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.