    87.   The results of the equipment integrity test must be provided to council when
          requested and must provide as a minimum the following information:
          a.   equipment identification number
          b.   location and date of test
          c.   results of test and test method
          d.   certification by and details of testing company or individual
          e.   discussion, conclusion and any remedial actions proposed, implemented and
               timetable for compliance.
          Ground water monitoring wells
    88.   The design and installation of ground water monitoring wells around the service
          station must be by a suitably qualified and experienced person. That person must
          provide the operator with a list of the industry standards that have been followed in
          connection with the design and installation. Copies of the design and installation
          certificates must be provided to Council prior to use of the service station.
    89.   The number and location of the ground water monitoring wells must be determined by
          a suitably qualified and experienced person, with a view to maximizing the likelihood
          that the wells will intercept contaminated ground water whatever the ground water
          flow conditions.
    90.   The ground water monitoring wells must be:
          a.   installed and operational before use of the service station
          b.   sealed to exclude surface water, clearly marked to indicate their presence and
               properly secured.
    91.   The ground water in the monitoring wells must be tested for petroleum contamination
          within 30 days after either:
          a.   the discovery whether by routine test or otherwise that ground water may be
               contaminated by petroleum originating from the property
          b.   the discovery whether pursuant to the loss monitoring procedure for the system
               or otherwise that the system has a leak.
          Vapour recovery
    92.   The design and installation of Stage 1 Vapour Recovery System to the service station
          must be by a suitably qualified and experienced person and comply with the
          following:
          a.   installed for all fuel storage tanks to return vapour displaced during filling
          b.   mixing of product must be prevented in pipework common to more than one
               tank
          c.   spring-loaded vapour return adaptor that closes when the hose is disconnected
               must be installed in the top of the riser
          d.   vapor recovery point must be located within 2 metres of the respective fill point.
    93.   Establish, implement, maintain and review procedures for the operation and
          maintenance of the system.




                                                                                    Page 16 of 171
Log in to download the original file

2015-05-26 Planning & Organisation Committee Agenda(PDF, 7MB).pdf · 7.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.