Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

2015-05-26 Planning & Organisation Committee Agenda

of 171

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  26 MAY 2015




            MATERIALS ON-SITE            DESTINATION
                                         Re-use and Recycling                     Disposal
            Expected waste     Estimated On-site          Off-site                *specify
            materials          volume    *specify         *specify                contractor and
                               (m³)      proposed re-use contractor and           landfill site or
                                         or on-site       recycling outlet        other disposal
                                         recycling                                site
                                         methods
            Excavation
            material
            Green waste
            Bricks
            Concrete
            Timber-please
            specify
            Plasterboard
            Metals - please
            specify
            Asbestos
            Other - please
            specify
          Note * If a demolition contractor is undertaking works, then the Waste Management
          table is to be completed by the demolition contractor.
           The purpose of the Waste Management Plan is to facilitate the segregation of waste
           for the effective reuse and recycling of such materials. Additionally Council rewards
           those who segregate waste by significantly reducing disposal fees at the landfill some
           items are free. Higher gate fees are charged for loads of mixed waste.



B.   Approve the application for Operational works for Signage in accordance with the following
     conditions:
     1.   Advertising devices undertaken in accordance with this approval must generally
          comply with the approved plans of development. The approved plans are listed in the
          following table unless otherwise amended by these conditions.
           Plan No.            Rev.    Plan/Document Name                              Date
           DA-01-02            E       Site – Roof & Signage Location Plan, prepared   1/04/2015
                                       by Powe Architects

           DA-05-01            C       Signage Schedule, prepared by Powe Architects   01/04/2015

     2.   Advertising devices authorised by this approval must be undertaken generally in
          accordance with the Approved Plans listed within this Decision Notice. The Approved
          Plans must be amended to incorporate the amendments listed within this Decision
          Notice and resubmitted to Council prior to the issue of any Development Permit for
          any civil works onsite.




                                                                                 Page 20 of 171
Log in to download the original file

2015-05-26 Planning & Organisation Committee Agenda(PDF, 7MB).pdf · 7.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.