PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 26 MAY 2015
Service Vehicles
18. Service vehicle parking, manoeuvring and standing spaces must be provided on the site.
The works must be undertaken in accordance with an Operational Works approval and
must include in particular a HRV space (12m x 3.6m)
Pedestrian and Bicycle Facilities
19. Pedestrian facilities must be provided for the development. The works must be undertaken
in accordance with an Operational Works approval and must include in particular a 2 metre
wide concrete footpath extending from the existing footpath in the eastern Gateway Drive
to the proposed pedestrian entry to the site.
This condition is imposed pursuant to s665 of the Sustainable Planning Act 2009 being
non-trunk infrastructure.
20. Bicycle parking and end of trip facilities must be provided onsite. In this regard 6 bicycle
parking spaces must be provided and:
a. 1 locker per 2 bicycle spaces and
b. 1 shower cubicle with ancillary change room per 10 bicycle spaces or part thereof.
The plans must be amended to meet this condition and submitted prior to the issue of an
operational works approval.
Stormwater Drainage
21. The site must be provided with a stormwater drainage system connecting to a lawful point
of discharge. The works must be undertaken in accordance with an Operational Works
approval and must include in particular:
a. stormwater drainage collected and discharged so there is no net increase in
stormwater runoff from the site
b. stormwater runoff discharged into the on-site connection point constructed in the
northern corner of the site as part of the works approved in the Development Permit
for Operational Works, Council reference OPW15/0043
c. the use of gravity stormwater drainage and not surcharge pits.
Stormwater Quality Management
22. A stormwater quality treatment system must be provided for the development. The works
must be undertaken in accordance with an Operational Works approval and must include in
particular:
a. Stormwater 360 Stormfilter system which:
i. is designed in accordance with the Stormwater Management StormFilter and
Enviropod Filter (SFEP) Technical Design Guide
ii. incorporates a high flow bypass if peak flows into the system exceed 50L/s
iii. is provided with energy dissipation to prevent re-suspension of accumulated
sediment
iv. is designed such that the siphon activates following a 5mm rainfall event over
the catchment area of the device
23. All Stormwater 360 proprietary stormwater quality treatment devices must be routinely
checked, serviced and cleaned in accordance with the manufacturer’s recommendations.
Records of all maintenance activities undertaken must be kept and made available to
Council upon request. Where replacement cartridges or other necessary components for
the system become unavailable, an alternative system is required to be retrofitted into the
development to achieve an equivalent pollutant reduction outcome.
Page 45 of 171
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.